Quick answers
What is Building Stone Quarry (QL No. DKD-190) "Sri. Abdul Rasheed"?
Building Stone Quarry (QL No. DKD-190) "Sri. Abdul Rasheed" is an approved mining project in Puduvettu, Beltangadi, Dakshina Kannada, Karnataka. The site covers 0.5 acres.
Who is building it?
The applicant is U K Abdul Rasheed.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Dec 2025), as of 27 Nov 2026.
Where is it?
In Puduvettu, Beltangadi, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹15 lakh and a site of 0.5 acres.
When was it filed?
The application was filed on 7 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Dec 2025 |
| Application filed | 7 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | U K Abdul Rasheed |
| Land area | 2,000 m² |
| Project cost | ₹15 lakh |
| Village / locality | Puduvettu |
| Taluk / tehsil | Beltangadi |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-03319 |
In context
122 applications in Dakshina Kannada since January 2022 are in the same category (Mining): 74 approved, 21 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.5 acres, this one is smaller than 100% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Puduvettu, Beltangadi, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — forest land use approved, 850 m away
- Ordinary Sand Block "Sri. T.C. Anthony" — environmental approval granted, 7.4 km away
- Widening to 2 lane with paved shoulders to NH-73 (New) Spur Road (Design… — under wildlife review, 8.4 km away
- Widening to 2 lane with paved shoulders to NH-73 (New) Spur Road (Design… — more information requested, 8.4 km away
- Widening to 2 lane with paved shoulders to NH-73 (New) Spur Road (Design… — more information requested, 8.4 km away
- 110kV SC line on DC Tower from existing 110/33/11kV Guruvayanakere station to… — more information requested, 9.6 km away
- Widening to 2 Lane With Paved Shoulder From Existing Km 75.00 to Existing Km… — more information requested, 10 km away
- Widening to 2 Lane With Paved Shoulder From Existing Km 75.00 to Existing Km… — under wildlife review, 10 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.