Quick answers
What is this project?
GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By BSNL @Pilathadi, Puduvettu Village, Belthangady Taluka, Dakshina Kannada Dist is an approved telecom project in Puduvettu, Beltangadi, Dakshina Kannada, Karnataka. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 16 Jul 2025), as of 27 Nov 2026.
Where is it?
In Puduvettu, Beltangadi, Dakshina Kannada, Karnataka.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 25 Dec 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 16 Jul 2025 |
| Application filed | 25 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹50 lakh |
| Village / locality | Puduvettu |
| Taluk / tehsil | Beltangadi |
| District | Dakshina Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07704 |
In context
18 applications in Dakshina Kannada since January 2022 are in the same category (Telecom): 7 approved, 1 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Puduvettu, Beltangadi, Dakshina Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone Quarry (QL No. DKD-190) "Sri. Abdul Rasheed" — environmental approval granted, 850 m away
- Ordinary Sand Block "Sri. T.C. Anthony" — environmental approval granted, 6.8 km away
- Widening to 2 lane with paved shoulders to NH-73 (New) Spur Road (Design… — under wildlife review, 7.5 km away
- Widening to 2 lane with paved shoulders to NH-73 (New) Spur Road (Design… — more information requested, 7.5 km away
- Widening to 2 lane with paved shoulders to NH-73 (New) Spur Road (Design… — more information requested, 7.5 km away
- 110kV SC line on DC Tower from existing 110/33/11kV Guruvayanakere station to… — more information requested, 9.4 km away
- Widening to 2 Lane With Paved Shoulder From Existing Km 75.00 to Existing Km… — more information requested, 10.7 km away
- Widening to 2 Lane With Paved Shoulder From Existing Km 75.00 to Existing Km… — under wildlife review, 10.7 km away
More from Mahesh Nair in Dakshina Kannada
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — lapsed
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — lapsed
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — lapsed
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — forest land use approved
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — lapsed
- GOI Funded 4G Saturation Project (Mobile Tower for Rural Uncovered area's) By… — lapsed