What is this project?
Expansion of Sugar Factory from 4,900 TCD to 15,000 TCD, Cogeneration Plant from 24 MW to 80 MW & Establishment of 800 KLPD Distillery by using C/ B heavy Molasses/ Cane Juice/ Grain by Inamdar Sugars Ltd. located at Hirekoppa and Murkumbi Villages, Tal.: Soundatti, Dist.: Belagavi, Karnataka State is a proposed industrial project in Markumbi, Savadatti, Belagavi, Karnataka. The site covers 85.3 acres.
Who is building it?
The applicant is Inamdar Sugars Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 1 Apr 2025), as of 27 Nov 2026.
Where is it?
In Markumbi, Savadatti, Belagavi, Karnataka.
How big is it?
It has a stated cost of ₹940 crore and a site of 85.3 acres.
When was it filed?
The application was filed on 6 Mar 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 1 Apr 2025 |
| Application filed | 6 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Inamdar Sugars Limited |
| Land area | 85.3 acres (34.5 ha) |
| Project cost | ₹940 crore |
| Village / locality | Markumbi |
| Taluk / tehsil | Savadatti |
| District | Belagavi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-03331 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 28 Oct 2026 | Under environmental review | 85.3 acres | ₹940 crore |
| Expansion filed 13 Mar 2026 | Returned to applicant | 85.3 acres | ₹940 crore |
| Early planning filed 6 Mar 2025 (this page) | Cleared for impact study | 85.3 acres | ₹940 crore |
In context
63 applications in Belagavi since January 2022 are in the same category (Industry): 35 approved, 20 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 85.3 acres, this one is smaller than 57% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Markumbi, Savadatti, Belagavi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Sugar Factory from 4,900 TCD to 15,000 TCD, Cogeneration Plant… — under environmental review, 0 m away
- Expansion of Sugar Factory from 4,900 TCD to 15,000 TCD, Cogeneration Plant… — returned to applicant, 0 m away
- Expansion of Sugar Factory from 3,500 TCD to 15,000 TCD, Cogeneration Plant… — cleared for impact study, 0 m away
- Building Stone Quarry "M/s Prince M Sand" Partner: Sri. Lokesh Venkatesh — environmental approval granted, 7.8 km away
- Diversion of forest land in Sy No.256 of Sogala, Sy No.3 of Kagihala Villages,… — in-principle approval, conditions pending, 8.7 km away
- Saundatti HEP Integrated Renewable Energy with Pumped Storage Project. — in-principle approval, conditions pending, 11.9 km away
- Ari Arjun Yallappa Hammini — environmental approval granted, 12.2 km away
- Saundatti IRESP - Storage Project — under environmental review, 12.3 km away
More from Inamdar Sugars Limited in Belagavi
- Expansion of Sugar Factory from 3,500 TCD to 15,000 TCD, Cogeneration Plant… — cleared for impact study