Quick answers
What is this project?
Saundatti HEP Integrated Renewable Energy with Pumped Storage Project is a proposed water and irrigation project in Kagihal, Savadatti, Belagavi, Karnataka. The site covers 528.1 acres.
Who is building it?
The applicant is Greenko KA01 IREP Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Kagihal, Savadatti, Belagavi, Karnataka.
How big is it?
It has a stated cost of ₹6,063.3 crore; a site of 528.1 acres and 396.4 acres (160.4 ha) of forest land.
When was it filed?
The application was filed on 9 Apr 2025.
Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 7 Aug 2026 |
| Application filed | 9 Apr 2025 |
| Approval sought | Forest land use |
| Application type | Ownership transfer |
| Sector | Water & irrigation |
| Applicant | Greenko KA01 IREP Private Limited |
| Land area | 528.1 acres (213.7 ha) |
| Forest land | 396.4 acres (160.4 ha) |
| Project cost | ₹6,063.3 crore |
| Village / locality | Kagihal |
| Taluk / tehsil | Savadatti |
| District | Belagavi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06922 |
In context
20 applications in Belagavi since January 2022 are in the same category (Water & irrigation): 1 approved, 13 filed or under review, and 6 withdrawn, lapsed or rejected. At 528.1 acres, this one is larger than 60% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kagihal, Savadatti, Belagavi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Saundatti IRESP - Storage Project — under environmental review, 650 m away
- Saundatti HEP (Integrated Renewable Energy with Pumped Storage Project) — withdrawn, 650 m away
- Saundatti HEP (Integrated Renewable Energy with Pumped Storage Project) — lapsed, 700 m away
- Saundatti HEP (1260 MW) Integrated Renewable Energy with Pumped Storage Project — environmental approval granted, 750 m away
- Saundatti IRESP - Storage Project — under environmental review, 850 m away
- Ari Arjun Yallappa Hammini — environmental approval granted, 3.8 km away
- Diversion of forest land in Sy No.256 of Sogala, Sy No.3 of Kagihala Villages,… — in-principle approval, conditions pending, 5.1 km away
- Building Stone Quarry "M/s Prince M Sand" Partner: Sri. Lokesh Venkatesh — environmental approval granted, 5.8 km away
More from Greenko KA01 IREP Private Limited in Belagavi
- Saundatti IRESP - Storage Project — under environmental review
- Saundatti IRESP - Storage Project — under environmental review
- Saundatti HEP (Integrated Renewable Energy with Pumped Storage Project) — withdrawn
- Saundatti HEP (Integrated Renewable Energy with Pumped Storage Project) — lapsed
All 5 Greenko KA01 IREP projects across India