Expansion of Building Stone Quarry "Sri. N. Keshava Reddy" is an approved mining project in Vaddapalli, Raichur, Karnataka. The site covers 1 acre.
Who is building it?
The applicant is N Keshava Reddy.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Aug 2026), as of 27 Nov 2026.
Where is it?
In Vaddapalli, Raichur, Karnataka.
How big is it?
It has a stated cost of ₹35 lakh and a site of 1 acre.
When was it filed?
The application was filed on 23 Mar 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Aug 2026 |
| Application filed | 23 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | N Keshava Reddy |
| Land area | 4,000 m² |
| Project cost | ₹35 lakh |
| Village / locality | Vaddapalli |
| Taluk / tehsil | Raichur |
| District | Raichur |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04352 |
In context
131 applications in Raichur since January 2022 are in the same category (Mining): 98 approved, 17 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1 acre, this one is smaller than 99% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Vaddapalli, Raichur, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Chandrabanda Industrial Area, over an area extent of 672.83 Acres (272.28… — cleared for impact study, 9.8 km away
- Building Stone Quarry "M/s. Akhilesh ANS Stone Crushers & M Sand LLP" — under environmental review, 12.1 km away
- Expansion of Integrated Steel Plant with capacity of Sponge Iron (DRI) from… — cleared for impact study, 12.2 km away
- Industrial project by Texcon Steels Limited — environmental approval granted, 12.2 km away
- Bulk drug manufacturing unit by M/s. Red Labs Chemicals Pvt Ltd — environmental approval granted, 12.7 km away
- Bulk drug manufacturing unit by M/s. Red Labs Chemicals Pvt Ltd — lapsed, 12.7 km away
- Greenfield No-frill Airport at Yegnur & Dund Villages, Raichur Taluka, Raichur… — environmental approval granted, 12.8 km away
- Application for No Increase in Pollution Load — initial checks, 12.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.