Project details
| Official title | Expansion of Integrated Steel Plant of M/s JSW Vijayanagar Metallics Limited(JVML) from 5 MTPA to 14 MTPA at Toranagallu Village, Sandur Taluk, Ballari District, Karnataka |
|---|---|
| Status | Cleared for impact study |
| Status since | 7 Oct 2026 |
| Application filed | 18 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Jsw Vijayanagar Metallics Limited |
| Land area | 956.1 acres (386.9 ha) |
| Project cost | ₹35,400 crore |
| Village / locality | Kurekuppa |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04420 |
In context
80 applications in Ballari since January 2022 are in the same category (Industry): 45 approved, 15 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 956.1 acres, this one is larger than 85% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kurekuppa, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of JSW Vijayanagar Metallics Limited(JVML) from 5 MTPA to 10 MTPA… — lapsed, 250 m away
- Split / Transfer of Coke Oven 6 unit of capacity 1.5 MTPA — environmental approval granted, 1000 m away
- Amendment in Environment Clearance (EC) of M/s JSW Steel Limited &… — environmental approval granted, 1.1 km away
- Environment Clearance for Change in Plant Configuration Without Increase in… — withdrawn, 1.2 km away
- Change in plant configuration without increase in steel production capacity of… — withdrawn, 1.2 km away
- Environment Clearance for Change in Plant Configuration Without Increase in… — withdrawn, 1.2 km away
- Partial Transfer of Environment Clearance for Installation of proposed 5 MTPA… — lapsed, 1.2 km away
- Split of existing EC of JSW Steel Ltd, Vijayanagar works of 18 MTPA Steel… — environmental approval granted, 1.3 km away
More from Jsw Vijayanagar Metallics Limited in Ballari
- Expansion of JSW Vijayanagar Metallics Limited(JVML) from 5 MTPA to 10 MTPA… — lapsed
- "Cold Rolled Non-Grain Oriented" (CRNO) Steel Plant with Capacity of 1.1 MTPA… — cleared for impact study
- Partial Transfer of Environment Clearance for Installation of proposed 5 MTPA… — lapsed
All 4 Jsw Vijayanagar Metallics projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.