Project details
| Official title | Proposal for Split of existing EC of JSW Steel Ltd, Vijayanagar works of 18 MTPA Steel plant, 1490 MW CPP along with 2.2 MTPA Slag cement between JSWSL, JVML and JSWCL, With a final configuration of 13 MTPA Steel, 1490 MW of CPP and 0.2 MTPA Slag cement unit will remain for JSW STEEL LTD, Transfer of 5 MTPA Steel to JVML and Transfer of 2 MTPA Slag Grinding Unit to Existing 4 MTPA Slag cement plant of JSWCL at Vijayanagar works, Toranagallu, Ballari, Karnataka |
|---|---|
| Status | Environmental approval granted |
| Status since | 25 Jul 2024 |
| Application filed | 20 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Other |
| Sector | Industry |
| Applicant | JSW Steel Limited |
| Land area | 7,991.9 acres (3,234.2 ha) |
| Project cost | ₹71,446 crore |
| Village / locality | Kurekuppa |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-02004 |
In context
80 applications in Ballari since January 2022 are in the same category (Industry): 45 approved, 15 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7,991.9 acres, this one is larger than 91% of them.
22 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kurekuppa, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Split of existing EC of JSW Steel Ltd, Vijayanagar works of 18 MTPA Steel… — withdrawn, 0 m away
- Split of existing EC of JSW Steel Ltd, Vijayanagar works of 18 MTPA Steel… — returned to applicant, 0 m away
- Environment Clearance for Change in Plant Configuration Without Increase in… — withdrawn, 150 m away
- Change in plant configuration without increase in steel production capacity of… — withdrawn, 150 m away
- Environment Clearance for Change in Plant Configuration Without Increase in… — withdrawn, 150 m away
- Partial Transfer of Environment Clearance for Installation of proposed 5 MTPA… — lapsed, 150 m away
- Amendment in Environment Clearance (EC) of M/s JSW Steel Limited &… — environmental approval granted, 300 m away
- Split / Transfer of Coke Oven 6 unit of capacity 1.5 MTPA — environmental approval granted, 400 m away
More from JSW Steel Limited in Ballari
- Amendment in Environment Clearance (EC) of M/s JSW Steel Limited &… — environmental approval granted
- Split / Transfer of Coke Oven 6 unit of capacity 1.5 MTPA — environmental approval granted
- EC for Setting up of 25 MTPA capacity (mineral throughput) Green-field High… — environmental approval granted
- Diversion of forestland over an extent of 2.781 ha area for pipe conveyor from… — in-principle approval, conditions pending
- EC for Setting up of 25 MTPA capacity (mineral throughput) Green-field High… — cleared for impact study
- Expansion / Modernization of Existing Jindal Vijayanagar Airport located at… — cleared for impact study
32 Jsw Steel projects in Ballari
All 97 Jsw Steel projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.