One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed 6000 Tcd Sugar Plant, 30 MW Cogeneration Power Plant & 200 Klpd Distillery…
Project details
| Official title | Proposed 6000 Tcd Sugar Plant, 30 MW Cogeneration Power Plant & 200 Klpd Distillery Based on C/B-Heavy Molasses/Sugarcane Juice/Syrup With 5 MW Captive Power Plant at Channapatna Village, Surpur Taluk, Yadgir District, Karnataka by M/S. Thaayi Thimmamma Sugar and Ethanol PVT. LTD (Ttsaepl) |
|---|---|
| Status | Lapsed |
| Status since | 7 Jun 2026 |
| Application filed | 29 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Thaayi Thimmamma Sugar and Ethanol Private Limited |
| Land area | 79.5 acres (32.2 ha) |
| Project cost | ₹476 crore |
| Village / locality | Channapattan |
| Taluk / tehsil | Shorapur |
| District | Yadgir |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04854 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 21 May 2026 | Under environmental review | 79.5 acres | ₹476 crore |
| Early planning filed 29 Apr 2026 (this page) | Lapsed | 79.5 acres | ₹476 crore |
| Early planning filed 6 Apr 2026 | Returned to applicant | 79.5 acres | ₹476 crore |
In context
94 applications in Yadgir since January 2022 are in the same category (Industry): 73 approved, 13 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 23 days from filing to approval. At 79.5 acres, this one is larger than 90% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Channapattan, Shorapur, Yadgir, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 6000 Tcd Sugar Plant, 30 MW Cogeneration Power Plant & 200 Klpd… — under environmental review, 0 m away
- Proposed 6000 Tcd Sugar Plant, 30 MW Cogeneration Power Plant & 200 Klpd… — returned to applicant, 0 m away
- Industrial project by Thaayi Thimmamma Sugar and Ethanol Pvt Ltd — cleared for impact study, 0 m away
- Ordinary Sand Block-RSB -33 — cleared for impact study, 10.4 km away
- Ordinary Sand Block-YDG-7 — under environmental review, 11.9 km away
- Ordinary Sand Block-YDG-7 — lapsed, 11.9 km away
- "Building Stone Quarry" of Shri. Siddappa, — under environmental review, 12.5 km away
- Providing Water supply scheme to Hunasagi Town. — more information requested, 14.4 km away
More from Thaayi Thimmamma Sugar and Ethanol Private Limited in Yadgir
- Industrial project by Thaayi Thimmamma Sugar and Ethanol Pvt Ltd — cleared for impact study
All 4 Thaayi Thimmamma Sugar projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.