What is Developing? Open the mapMap

Under environmental reviewIndustry · Yadgir, Karnataka

Proposed 6000 Tcd Sugar Plant, 30 MW Cogeneration Power Plant & 200 Klpd Distillery Based on C/B-Heavy Molasses/Sugarcane Juice/Syrup With 5 MW Captive Power Plant

Proposed 6000 Tcd Sugar Plant, 30 MW Cogeneration Power Plant & 200 Klpd Distillery Based on C/B-Heavy Molasses/Sugarcane Juice/Syrup With 5 MW Captive Power Plant is a proposed industrial project in Channapattan, Shorapur, Yadgir, Karnataka. The site covers 79.5 acres. Its stated project cost is ₹476 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 27 May 2026).

See it on the live map All projects in Yadgir

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposed 6000 Tcd Sugar Plant, 30 MW Cogeneration Power Plant & 200 Klpd Distillery Based on C/B-Heavy Molasses/Sugarcane Juice/Syrup With 5 MW Captive Power Plant at Channapatna Village, Surpur Taluk, Yadgir District, Karnataka by M/S. Thaayi Thimmamma Sugar and Ethanol PVT. LTD (Ttsaepl)
StatusUnder environmental review
Status since27 May 2026
Application filed21 May 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantThaayi Thimmamma Sugar and Ethanol Private Limited
Land area79.5 acres (32.2 ha)
Project cost₹476 crore
Village / localityChannapattan
Taluk / tehsilShorapur
DistrictYadgir
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-05890

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Early planning filed 21 May 2026 (this page)Under environmental review79.5 acres₹476 crore
Early planning filed 29 Apr 2026Lapsed79.5 acres₹476 crore
Early planning filed 6 Apr 2026Returned to applicant79.5 acres₹476 crore

In context

94 applications in Yadgir since January 2022 are in the same category (Industry): 73 approved, 13 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 23 days from filing to approval. At 79.5 acres, this one is larger than 90% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Channapattan, Shorapur, Yadgir, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Thaayi Thimmamma Sugar and Ethanol Private Limited in Yadgir

All 4 Thaayi Thimmamma Sugar projects across India

About this information