Quick answers
What is this project?
"Factory -E, EV Two Wheeler & Parts" by M/s. Honda Motorcycle and Scooter India Pvt Ltd is a proposed building project in Jakksandra, Malur, Kolar, Karnataka. The site covers 17.4 acres.
Who is building it?
The applicant is Honda Motorcycle and Scooter India Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Jakksandra, Malur, Kolar, Karnataka.
How big is it?
It has a stated cost of ₹600 crore and a site of 17.4 acres.
When was it filed?
The application was filed on 28 Aug 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 10 Nov 2026 |
| Application filed | 28 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Honda Motorcycle and Scooter India Private Limited |
| Land area | 17.4 acres (7.1 ha) |
| Project cost | ₹600 crore |
| Village / locality | Jakksandra |
| Taluk / tehsil | Malur |
| District | Kolar |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-05001 |
In context
25 applications in Kolar since January 2022 are in the same category (Buildings & townships): 12 approved, 8 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 17.4 acres, this one is smaller than 84% of them.
38 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jakksandra, Malur, Kolar, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Industrial and Logistic Park by M/S. Deerfield Logistics Private… — more information requested, 350 m away
- Jakkasandra Industrial Area Phase-II (Mindahalli) — environmental approval granted, 1.2 km away
- Expansion of Building Stone Quarry (QL No. 892) "M/s. Shashank Stone Works" — environmental approval granted, 1.3 km away
- "Building Stone Quarry" of Sri Venkatesh Reddy — cleared for impact study, 1.3 km away
- Extension of Validity of Environmental Clearance "M/s Anjaneya Quarry Works… — environmental approval granted, 1.5 km away
- Building Stone Quarry — environmental approval granted, 1.5 km away
- Environmental Clearance for Building Stone Quarry in 0-20 Acres of Govt.… — under environmental review, 1.5 km away
- Building Stone Quarrying Project — environmental approval granted, 1.6 km away
All 4 Honda Motorcycle and Scooter projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.