What is Developing? Open the mapMap

Environmental approval grantedIndustry · Ballari, Karnataka

Proposed 6 MTPA Integrated Steel Plant by M/s Uttam Galva Ferous Limited

Proposed 6 MTPA Integrated Steel Plant by M/s Uttam Galva Ferous Limited is an approved industrial project in Erangaligi, Kurugodu, Ballari, Karnataka. The site covers 4,877.1 acres. Its stated project cost is ₹36,000 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 4 Sept 2026).

See it on the live map All projects in Ballari

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposed 6 MTPA Integrated Steel Plant along with captive power generation of 893 MW by M/s Uttam Galva Ferous Limited
StatusEnvironmental approval granted
Status since4 Sept 2026
Application filed11 May 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorIndustry
ApplicantUgfl
Land area4,877.1 acres (1,973.7 ha)
Project cost₹36,000 crore
Village / localityErangaligi
Taluk / tehsilKurugodu
DistrictBallari
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-05066

In context

80 applications in Ballari since January 2022 are in the same category (Industry): 45 approved, 15 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4,877.1 acres, this one is larger than 87% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Erangaligi, Kurugodu, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.