Quick answers
What is Sri Basavaraj S/o Basavantappa Hireraddi?
Sri Basavaraj S/o Basavantappa Hireraddi is a proposed mining project in Khan Peth, Ramdurg, Belagavi, Karnataka. The site covers 5 acres.
Who is building it?
The applicant is Basavaraj Hireraddi.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Khan Peth, Ramdurg, Belagavi, Karnataka.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 5 acres.
When was it filed?
The application was filed on 5 Sept 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 9 Nov 2026 |
| Application filed | 5 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Basavaraj Hireraddi |
| Land area | 5 acres (2 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Khan Peth |
| Taluk / tehsil | Ramdurg |
| District | Belagavi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-05172 |
In context
186 applications in Belagavi since January 2022 are in the same category (Mining): 137 approved, 26 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5 acres, this one is smaller than 54% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Khan Peth, Ramdurg, Belagavi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone Quarry — environmental approval granted, 1.7 km away
- Building Stone (M-Sand) Quarry — environmental approval granted, 3.4 km away
- Multi Village Water Supply Scheme to Awaradi And other 115 Villages (136… — in-principle approval, conditions pending, 3.7 km away
- Diversion of Forest Land for Construction of Road in Sy No 70/A of… — lapsed, 8.5 km away
- Regularization of As-Built Area Outside the Approved Forest Clearance (6.948… — under forest review, 8.5 km away
- Ordinary Sand Quarry "Sri. Goudappa D. Patil" — environmental approval granted, 8.7 km away
- Construction and Establishment of Meditation and Yoga Center — more information requested, 10.7 km away
- Construction and Establishment of Educational Center — more information requested, 10.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.