Quick answers
What is this project?
Diversion of Forest Land for Construction of Road in Sy No 70/A of Rankalakoppa Village, Ramdurga Taluk, Belagavi District is a lapsed road project in Rankalkop, Ramdurg, Belagavi, Karnataka. The site covers 4.3 acres.
Who is building it?
The applicant is Iranna Gudadari.
Has it been approved?
No. The application was lapsed on 17 Nov 2026, so it is no longer under consideration.
Where is it?
In Rankalkop, Ramdurg, Belagavi, Karnataka.
How big is it?
It has a stated cost of ₹18 lakh; a site of 4.3 acres and 2,900 m² of forest land.
When was it filed?
The application was filed on 12 Feb 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 12 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Iranna Gudadari |
| Land area | 4.3 acres (1.7 ha) |
| Forest land | 2,900 m² |
| Project cost | ₹18 lakh |
| Village / locality | Rankalkop |
| Taluk / tehsil | Ramdurg |
| District | Belagavi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06791 |
In context
29 applications in Belagavi since January 2022 are in the same category (Roads & highways): 1 approved, 17 filed or under review, and 11 withdrawn, lapsed or rejected. At 4.3 acres, this one is larger than 78% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rankalkop, Ramdurg, Belagavi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction and Establishment of Meditation and Yoga Center — more information requested, 2.6 km away
- Construction and Establishment of Educational Center — more information requested, 2.7 km away
- Forest Clearance for Providing Water Supply System to Ramdurg Town Under Amrut… — lapsed, 2.9 km away
- Multi Village Water Supply Scheme to Awaradi And other 115 Villages (136… — in-principle approval, conditions pending, 5.7 km away
- Building Stone Quarry — environmental approval granted, 7.6 km away
- Sri Basavaraj S/o Basavantappa Hireraddi — under environmental review, 8.5 km away
- Expansion of Existing 60 KLPD Grain-Based Distillery to 300 KLPD Multi-Feed… — more information requested, 9.3 km away
- Expansion of Existing 60 KLPD Grain-Based Distillery to 300 KLPD Multi-Feed… — cleared for impact study, 9.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.