What is Developing? Open the mapMap

Cleared for impact studyIndustry · Tumakuru, Karnataka

Proposed Integrated Secondary Aluminium Metallurgical and Downstream Processing Complex comprising Aluminium Scrap Processing Capacity of 3,87,504 MTPA, Aluminium Billet Casting / Foundry Capacity of 5,20,000 MTPA, Aluminium Extrusion Profile Manufacturing Capacity of 4,50,000 MTPA, Shot Blasting unit, Anodizing unit and Solar Frame Manufacturing unit each with Capacity of 72,000 MTPA, Powder Coating unit and Aluminium Fabrication & Machining unit each with Capacity of 12,000 MTPA.

Proposed Integrated Secondary Aluminium Metallurgical and Downstream Processing Complex comprising Aluminium Scrap Processing Capacity of 3,87,504 MTPA, Aluminium Billet Casting / Foundry Capacity of 5,20,000 MTPA, Aluminium Extrusion Profile Manufacturing Capacity of 4,50,000 MTPA, Shot Blasting unit, Anodizing unit and Solar Frame Manufacturing unit each with Capacity of 72,000 MTPA, Powder Coating unit and Aluminium Fabrication & Machining unit each with Capacity of 12,000 MTPA is a proposed industrial project in Sorekunte, Tumakuru, Karnataka. The site covers 149.7 acres. Its stated project cost is ₹6,000 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 27 Nov 2026).

See it on the live map All projects in Tumakuru

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Integrated Secondary Aluminium Metallurgical and Downstream Processing Complex comprising Aluminium Scrap Processing Capacity of 3,87,504 MTPA, Aluminium Billet Casting / Foundry Capacity of 5,20,000 MTPA, Aluminium Extrusion Profile Manufacturing Capacity of 4,50,000 MTPA, Shot Blasting unit, Anodizing unit and Solar Frame Manufacturing unit each with Capacity of 72,000 MTPA, Powder Coating unit and Aluminium Fabrication & Machining unit each with Capacity of 12,000 MTPA is a proposed industrial project in Sorekunte, Tumakuru, Karnataka. The site covers 149.7 acres.

Who is building it?

The applicant is Jindal Aluminium Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 27 Nov 2026), as of 27 Nov 2026.

Where is it?

In Sorekunte, Tumakuru, Karnataka.

How big is it?

It has a stated cost of ₹6,000 crore and a site of 149.7 acres.

When was it filed?

The application was filed on 20 Jun 2026.

Project details

StatusCleared for impact study
Status since27 Nov 2026
Application filed20 Jun 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantJindal Aluminium Limited
Land area149.7 acres (60.6 ha)
Project cost₹6,000 crore
Village / localitySorekunte
Taluk / tehsilTumakuru
DistrictTumakuru
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-05181

In context

14 applications in Tumakuru since January 2022 are in the same category (Industry): 11 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 149.7 acres, this one is larger than 79% of them.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sorekunte, Tumakuru, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.