What is Developing? Open the mapMap

Cleared for impact studyIndustry · Bagalkote, Karnataka

Expansion of Sugar Plant from 5,000 TCD to 15,000 TCD white crystal & refined sugar and Co-generation Power Plant from 20 MW to 50 MW by M/s. Nirani Sugars Limited Unit-5

Expansion of Sugar Plant from 5,000 TCD to 15,000 TCD white crystal & refined sugar and Co-generation Power Plant from 20 MW to 50 MW by M/s. Nirani Sugars Limited Unit-5 is a proposed industrial project in Badami, Bagalkote, Karnataka. The site covers 68.5 acres. Its stated project cost is ₹365.9 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Jan 2026).

See it on the live map All projects in Bagalkote

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Sugar Plant from 5,000 TCD to 15,000 TCD white crystal & refined sugar and Co-generation Power Plant from 20 MW to 50 MW by M/s. Nirani Sugars Limited Unit-5 is a proposed industrial project in Badami, Bagalkote, Karnataka. The site covers 68.5 acres.

Who is building it?

The applicant is Nirani Sugars Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Jan 2026), as of 27 Nov 2026.

Where is it?

In Badami, Bagalkote, Karnataka.

How big is it?

It has a stated cost of ₹365.9 crore and a site of 68.5 acres.

When was it filed?

The application was filed on 17 Jan 2026.

Project details

StatusCleared for impact study
Status since17 Jan 2026
Application filed17 Jan 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantNirani Sugars Limited
Land area68.5 acres (27.7 ha)
Project cost₹365.9 crore
Village / localityBadami
Taluk / tehsilBadami
DistrictBagalkote
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-05254

In context

61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 68.5 acres, this one is smaller than 56% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Badami, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Nirani Sugars Limited in Bagalkote

5 Nirani Sugars projects in Bagalkote
All 6 Nirani Sugars projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.