Quick answers
What is this project?
Expansion of 200 KLPD ENA/RS/Ethanol with cane syrup/molasses based to 700 KLPD ENA/RS/Ethanol/IA/ Ethanol based chemicals/Sustainable Aviation Fuel with multifeed stock (cane syrup/molasses based/Grain) based and Co-generation Power Plant from 3 MW to 13 MW by M/s. Trualt Bioenergy Limited Unit-5 is a proposed industrial project in Badami, Bagalkote, Karnataka. The site covers 27.5 acres.
Who is building it?
The applicant is Trualt Bioenergy Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Oct 2026), as of 27 Nov 2026.
Where is it?
In Badami, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹695 crore and a site of 27.5 acres.
When was it filed?
The application was filed on 21 Aug 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 18 Oct 2026 |
| Application filed | 21 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Trualt Bioenergy Limited |
| Land area | 27.5 acres (11.1 ha) |
| Project cost | ₹695 crore |
| Village / locality | Badami |
| Taluk / tehsil | Badami |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-04493 |
In context
61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 27.5 acres, this one is smaller than 84% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Badami, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of Distillery Section in the Environment Clearance Granted for the… — environmental approval granted, 250 m away
- Transfer of Distillery Section in the Environment Clearance Granted for the… — lapsed, 250 m away
- Transfer of Distillery Section in the Environment Clearance Granted for the… — withdrawn, 250 m away
- New Distillery Unit of 200 Klpd Capacity and Expansion of Sugar Plant From… — environmental approval granted, 250 m away
- New Distillery Unit of 200 Klpd Capacity and Expansion of Sugar Plant From… — environmental approval granted, 250 m away
- Expansion of Sugar Plant from 5,000 TCD to 15,000 TCD white crystal & refined… — cleared for impact study, 300 m away
- Diversion of 0.0524 Ha Forest Land of Hebballi and Lakahamapur Villages for… — more information requested, 2.8 km away
- Laying of Pipeline From Adagala to Kabbalageri for Drinking Water Purpose — lapsed, 3.5 km away
More from Trualt Bioenergy Limited in Bagalkote
- Expansion of Distillery from 120 KLPD to 700 KLPD for manufacturing of RS/… — returned to applicant
- Manufacturing of RS/ ENA/ Industrial Alcohol / Sustainable Aviation Fuel (SAF)… — cleared for impact study
- Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane… — returned to applicant
- Use of Additional Feedstock – Grain in Addition to the Existing Feedstocks… — lapsed
- Expansion of Distillery for Ethanol Production Under Ebp Program From 700 Kld… — environmental approval granted
- Proposed 500 KLPD Multi-feed (B-Heavy Molasses/C-Heavy Molasses/Cane… — environmental approval granted
All 10 Trualt Bioenergy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.