Expansion of 200 KLPD ENA/RS/Ethanol with cane syrup/molasses based to 700 KLPD ENA/RS/Ethanol/IA/ Ethanol based chemicals/Sustainable Aviation Fuel with multifeed stock (cane syrup/molasses based/Grain) based and Co-generation Power Plant from 3 MW to 13 MW by M/s. Trualt Bioenergy Limited Unit-5

Expansion of 200 KLPD ENA/RS/Ethanol with cane syrup/molasses based to 700 KLPD ENA/RS/Ethanol/IA/ Ethanol based chemicals/Sustainable Aviation Fuel with multifeed stock (cane syrup/molasses based/Grain) based and Co-generation Power Plant from 3 MW to 13 MW by M/s. Trualt Bioenergy Limited Unit-5 is a proposed industrial project in Badami, Bagalkote, Karnataka. The site covers 27.5 acres. Its stated project cost is ₹695 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 18 Oct 2026).

See it on the live map All projects in Bagalkote

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of 200 KLPD ENA/RS/Ethanol with cane syrup/molasses based to 700 KLPD ENA/RS/Ethanol/IA/ Ethanol based chemicals/Sustainable Aviation Fuel with multifeed stock (cane syrup/molasses based/Grain) based and Co-generation Power Plant from 3 MW to 13 MW by M/s. Trualt Bioenergy Limited Unit-5 is a proposed industrial project in Badami, Bagalkote, Karnataka. The site covers 27.5 acres.

Who is building it?

The applicant is Trualt Bioenergy Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 18 Oct 2026), as of 27 Nov 2026.

Where is it?

In Badami, Bagalkote, Karnataka.

How big is it?

It has a stated cost of ₹695 crore and a site of 27.5 acres.

When was it filed?

The application was filed on 21 Aug 2026.

Project details

StatusCleared for impact study
Status since18 Oct 2026
Application filed21 Aug 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantTrualt Bioenergy Limited
Land area27.5 acres (11.1 ha)
Project cost₹695 crore
Village / localityBadami
Taluk / tehsilBadami
DistrictBagalkote
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-04493

In context

61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 27.5 acres, this one is smaller than 84% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Badami, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Trualt Bioenergy Limited in Bagalkote

All 10 Trualt Bioenergy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.