Project details
| Status | Lapsed |
|---|---|
| Status since | 14 Mar 2025 |
| Application filed | 24 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Mining |
| Applicant | Veerabhadrappa Sangappa and Company |
| Land area | 5.3 acres (2.2 ha) |
| Forest land | 131.4 acres (53.2 ha) |
| Project cost | ₹4.9 crore |
| Village / locality | Ramgad |
| Taluk / tehsil | Sandur |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-05996 |
In context
213 applications in Ballari since January 2022 are in the same category (Mining): 78 approved, 56 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.3 acres, this one is smaller than 86% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 155.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 12 mining leases have applied within 5 km.
Where it is
Ramgad, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Production of 0.90 MTPA Iron Ore of Ramanadurga Iron Ore Mine over an area of… — lapsed, 450 m away
- Production of 0.90 MTPA Iron Ore of Ramanadurga Iron Ore Mine over an area of… — cleared for impact study, 500 m away
- Environmental Clearance for Iron Ore production of 0.216 MTPA by retaining the… — cleared for impact study, 700 m away
- Ramanadurga Iron Ore Mine — under forest review, 700 m away
- Increase in production capacity from 0.94 MMTPA to 1.382 MMTPA of Rama Iron… — environmental approval granted, 1.9 km away
- Increase in production capacity from 0.94 MMTPA to 1.382 MMTPA of Rama Iron… — lapsed, 1.9 km away
- Increase in production capacity from 0.94 MMTPA to 1.382 MMTPA of Rama Iron… — lapsed, 1.9 km away
- Increase in production capacity from 0.94 MMTPA to 1.382 MMTPA of Rama Iron… — cleared for impact study, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.