What is Developing? Open the mapMap

LapsedMining · Ballari, Karnataka

Increase in production capacity from 0.94 MMTPA to 1.382 MMTPA of Rama Iron Ore Mine (ML No. 009) over an area of 32.56 Ha

Increase in production capacity from 0.94 MMTPA to 1.382 MMTPA of Rama Iron Ore Mine (ML No. 009) over an area of 32.56 Ha is a lapsed mining project in Ramgad, Sandur, Ballari, Karnataka. The site covers 80.5 acres. Its stated project cost is ₹11.3 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Ballari

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 4 filings for this project. The project's main page, with every filing and where each stands: Increase in production capacity from 0.94 MMTPA to 1.382 MMTPA of Rama Iron Ore Mine (ML…

Project details

Official titleIncrease in production capacity from 0.94 MMTPA to 1.382 MMTPA of Rama Iron Ore Mine (ML No. 009) over an area of 32.56 Ha. located in Village-Ramgad, Taluk- Sandur, District-Ballari, State-Karnataka.
StatusLapsed
Status since29 Oct 2024
Application filed5 Jan 2024
Approval soughtEnvironmental approval
Application typeExpansion
SectorMining
ApplicantJsw Steel Limited
Land area80.5 acres (32.6 ha)
Project cost₹11.3 crore
Village / localityRamgad
Taluk / tehsilSandur
DistrictBallari
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-02333

All filings for this project

This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 15 May 2024Environmental approval granted80.5 acres₹39.1 crore
Expansion filed 29 Jan 2024Lapsed80.5 acres₹11.3 crore
Expansion filed 5 Jan 2024 (this page)Lapsed80.5 acres₹11.3 crore
Early planning filed 8 May 2023Cleared for impact study80.5 acres₹39.1 crore

In context

213 applications in Ballari since January 2022 are in the same category (Mining): 78 approved, 56 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 80.5 acres, this one is smaller than 55% of them.

No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.

Where it is

Ramgad, Sandur, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jsw Steel Limited in Ballari

32 Jsw Steel projects in Ballari
All 97 Jsw Steel projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.