Quick answers
What is this project?
Forest Clearance for Providing Water Supply System to Ramdurg Town Under Amrut 2.O Including Operation & Maintenance For A Period Of 5 Years (Including 1 Year DLP) Through Design, Build Operation And Transfer (DBOT) Mode is a lapsed pipeline project in Kilabnur, Ramdurg, Belagavi, Karnataka. The site covers 24.7 acres.
Who is building it?
The applicant is Ashvini S Kalkutkar.
Has it been approved?
No. The application was lapsed on 17 Nov 2026, so it is no longer under consideration.
Where is it?
In Kilabnur, Ramdurg, Belagavi, Karnataka.
How big is it?
It has a stated cost of ₹14.1 crore; a site of 24.7 acres and 1.7 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 10 Dec 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Nov 2026 |
| Application filed | 10 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Ashvini S Kalkutkar |
| Land area | 24.7 acres (10 ha) |
| Forest land | 1.7 acres (0.7 ha) |
| Project cost | ₹14.1 crore |
| Village / locality | Kilabnur |
| Taluk / tehsil | Ramdurg |
| District | Belagavi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06110 |
In context
7 applications in Belagavi since January 2022 are in the same category (Pipelines): 0 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kilabnur, Ramdurg, Belagavi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Construction of Road in Sy No 70/A of… — lapsed, 2.9 km away
- Construction and Establishment of Meditation and Yoga Center — more information requested, 3.3 km away
- Construction and Establishment of Educational Center — more information requested, 3.4 km away
- Multi Village Water Supply Scheme to Awaradi And other 115 Villages (136… — in-principle approval, conditions pending, 7.6 km away
- Ordinary River Sand Quarry — environmental approval granted, 7.9 km away
- Ordinary River Sand Quarry — environmental approval granted, 7.9 km away
- Ordinary River Sand Quarry — environmental approval granted, 7.9 km away
- Gonnagara Sand Block (Block No.-1) Lease Area of 8.90 Ha (22.00 Acres) — under environmental review, 8.5 km away
More from Ashvini S Kalkutkar in Belagavi
- Providing water supply system to Yargatti, Ramdurga, Boragoan, Kabbur, Kagwad… — under forest review
- Providing water supply system to Alamela, Nalatwad, Chadachan, Talikote and… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.