Quick answers
What is this project?
Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity by NHAI is an approved road project in Bisalakoppa, Sirsi, Uttara Kannada, Karnataka. The site covers 127.2 acres.
Who is building it?
The applicant is National Highways Authority of India (NHAI).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 28 Apr 2026), as of 27 Nov 2026.
Where is it?
In Bisalakoppa, Sirsi, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹294.6 crore; a site of 127.2 acres and 70.1 acres (28.4 ha) of forest land.
When was it filed?
The application was filed on 24 Sept 2023.
Project details
| Official title | Consultancy Services for preparation of Feasibility Study/Detailed Project Report of selected road stretches for upgradation 2/4 lane NH connectivity under Sagarmala Scheme- SH-2: Haveri - Yekambi (54.0 km),SH-69: Yekambi-Sirsi (26.0 km) in the State of Karnataka, Total length 80.00 km (Package No. NHAI/PC/SM/04) |
|---|---|
| Status | Forest land use approved |
| Status since | 28 Apr 2026 |
| Application filed | 24 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highways Authority of India (NHAI) |
| Land area | 127.2 acres (51.5 ha) |
| Forest land | 70.1 acres (28.4 ha) |
| Project cost | ₹294.6 crore |
| Village / locality | Bisalakoppa |
| Taluk / tehsil | Sirsi |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site area on record |
| Our reference | WID-KA-06122 |
In context
48 applications in Uttara Kannada since January 2022 are in the same category (Roads & highways): 1 approved, 21 filed or under review, and 24 withdrawn, lapsed or rejected. At 127.2 acres, this one is larger than 98% of them.
Where it is
Bisalakoppa, Sirsi, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Providing Ug Ofc Connectivity to Atabail and Kurli Bsnl 4g Saturation Tower… — forest land use approved, 17.6 km away
- Providing Ug Ofc Connectivity to Atabail and Kurli Bsnl 4g Saturation Tower… — lapsed, 17.6 km away
- Providing Ug Ofc Connectivity to Atabail and Kurli Bsnl 4g Saturation Tower… — lapsed, 17.6 km away
- 4g Saturation Project for Row of Non Forest Land in Mundagod Taluka — lapsed, 21.1 km away
- Bsnl 4 G Saturation Project at Shanvalli — forest land use approved, 21.9 km away
- Bsnl 4g Saturation Tower Project Bijjankoppa — forest land use approved, 22.4 km away
- Diversion of Forest land in Forest Survey No. 6 of Narebail Village for… — under forest review, 22.4 km away
- Diversion of 0.072 Ha of Forest Land in F.Sy No 140 of Isloor Village for… — lapsed, 23.2 km away
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.