Quick answers
What is this project?
4g Saturation Project for Row of Non Forest Land in Mundagod Taluka is a lapsed project in Ajjihalli, Mundgod, Uttara Kannada, Karnataka. The site covers 0.2 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 13 Aug 2025, so it is no longer under consideration.
Where is it?
In Ajjihalli, Mundgod, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹2 crore; a site of 0.2 acres and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 31 Jan 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 13 Aug 2025 |
| Application filed | 31 Jan 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 800 m² |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹2 crore |
| Village / locality | Ajjihalli |
| Taluk / tehsil | Mundgod |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06854 |
In context
82 applications in Uttara Kannada since January 2022 are in the same category (Other): 3 approved, 36 filed or under review, and 22 withdrawn, lapsed or rejected. At 0.2 acres, this one is larger than 63% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ajjihalli, Mundgod, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kundargi Vividoddesha Prathamika Grameena Krushi Sahakara Sangha Niyamita branch — lapsed, 4 km away
- Providing Ug Ofc Connectivity to Atabail and Kurli Bsnl 4g Saturation Tower… — forest land use approved, 5.8 km away
- Providing Ug Ofc Connectivity to Atabail and Kurli Bsnl 4g Saturation Tower… — lapsed, 5.8 km away
- Providing Ug Ofc Connectivity to Atabail and Kurli Bsnl 4g Saturation Tower… — lapsed, 5.8 km away
- Bsnl 4 G Saturation Project at Shanvalli — forest land use approved, 6.7 km away
- Bsnl 4g Saturation Tower Project Bijjankoppa — forest land use approved, 8.3 km away
- UNDERGROUND OFC LAYING UNDER BSNL 4G TOWER SATURATION PROJECT on JAKKOLLI… — lapsed, 8.4 km away
- Bsnl 4g Saturation Project Hotageri — forest land use approved, 9.5 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.