Quick answers
What is Diversion of Forest Land?
Diversion of Forest Land is a lapsed water and irrigation project in Ramtirth, Jamkhandi, Bagalkote, Karnataka. The site covers 0.2 acres.
Who is building it?
The applicant is Executive Engineer Rdws Division Bagalkot.
Has it been approved?
No. The application was lapsed on 23 Oct 2024, so it is no longer under consideration.
Where is it?
In Ramtirth, Jamkhandi, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹8 lakh; a site of 0.2 acres and 790 m² of forest land.
When was it filed?
The application was filed on 27 Jul 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of Forest Land
Project details
| Official title | Diversion of Forest Land in Ramthirtha Village for the Construction of Over Head Tank to Provide Drinking Water Facility Under Jal Jeevan Mission |
|---|---|
| Status | Lapsed |
| Status since | 23 Oct 2024 |
| Application filed | 27 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Executive Engineer Rdws Division Bagalkot |
| Land area | 800 m² |
| Forest land | 790 m² |
| Project cost | ₹8 lakh |
| Village / locality | Ramtirth |
| Taluk / tehsil | Jamkhandi |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06415 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Jan 2025 | Lapsed | 0.2 acres | ₹8 lakh |
| New project filed 27 Jul 2024 (this page) | Lapsed | 0.2 acres | ₹8 lakh |
In context
14 applications in Bagalkote since January 2022 are in the same category (Water & irrigation): 2 approved, 5 filed or under review, and 7 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 100% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ramtirth, Jamkhandi, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land — lapsed, 0 m away
- Diversion of 0.187 Ha. of Forest Land — initial checks, 150 m away
- Royal Palace College — more information requested, 1000 m away
- Construction of Bcm Hostel Building at Jamkhandi — lapsed, 1 km away
- Diversion of 18.458 Ha of forest land in Sy No. 6,7,8,205,210 & 219 of… — more information requested, 2.9 km away
- 11KV Siddapur IP New Linkline Work — lapsed, 3.1 km away
- Diversion of Forest Land for Improvement of Water Supply Scheme to Jamakhandi… — under forest review, 3.2 km away
- Diversion of Forest Land for Improvement of Water Supply Scheme to Jamakhandi… — lapsed, 3.3 km away
More from Executive Engineer Rdws Division Bagalkot in Bagalkote
- Multi Village Drinking WSS covering all Rural habitations of Bagalkot, Bilagi,… — under forest review
- Multi Village Drinking WSS covering all Rural habitations of Bagalkot, Bilagi,… — more information requested
- Multi Village Water Supply Scheme to All Rural Habitations in Jamakhandi and… — lapsed
- Zonal Balancing Tank and Approach Road to provide drinking water facility to… — forest land use approved
- Construction of ELSR at Benakanawari village in Hunagund Taluka of Bagalkot… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.