Quick answers
What is this project?
Multi Village Water Supply Scheme to All Rural Habitations in Jamakhandi and Rabakavi-Banahatti Taluks of Bagalkot District From Hipperagi Barrage Source (Scheme 1) on Dbot Basis Under Jal Jeevan Mission is a lapsed water and irrigation project in Alabal, Jamkhandi, Bagalkote, Karnataka. The site covers 1,660.1 acres.
Who is building it?
The applicant is Executive Engineer Rdws Division Bagalkot.
Has it been approved?
No. The application was lapsed on 27 Nov 2026, so it is no longer under consideration.
Where is it?
In Alabal, Jamkhandi, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹322.7 crore; a site of 1,660.1 acres and 7.5 acres (3 ha) of forest land.
When was it filed?
The application was filed on 27 May 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 27 Nov 2026 |
| Application filed | 27 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Executive Engineer Rdws Division Bagalkot |
| Land area | 1,660.1 acres (671.8 ha) |
| Forest land | 7.5 acres (3 ha) |
| Project cost | ₹322.7 crore |
| Village / locality | Alabal |
| Taluk / tehsil | Jamkhandi |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07706 |
In context
14 applications in Bagalkote since January 2022 are in the same category (Water & irrigation): 2 approved, 5 filed or under review, and 7 withdrawn, lapsed or rejected. At 1,660.1 acres, this one is larger than 71% of them.
Where it is
Alabal, Jamkhandi, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Use of Additional Feedstock – Grain in Addition to the Existing Feedstocks… — lapsed, 6.8 km away
- Addition of Grain as a Raw Material in 600 KLPD Distillery based on B/C Heavy… — initial checks, 6.8 km away
- Transfer of Environmental Clearance From M/s MRN Chamundi Cane Power and… — environmental approval granted, 6.9 km away
- Amendment in Environment Clearances Condition Granted to Sugar & Cogen Complex… — environmental approval granted, 6.9 km away
- Request for transfer of Environment Clearance/ change of name from M/s. SHRI… — environmental approval granted, 6.9 km away
- Diversion of 0.187 Ha. of Forest Land — initial checks, 10.6 km away
- Diversion of Forest Land — lapsed, 10.7 km away
- Diversion of Forest Land — lapsed, 10.7 km away
More from Executive Engineer Rdws Division Bagalkot in Bagalkote
- Multi Village Drinking WSS covering all Rural habitations of Bagalkot, Bilagi,… — under forest review
- Multi Village Drinking WSS covering all Rural habitations of Bagalkot, Bilagi,… — more information requested
- Diversion of Forest Land — lapsed
- Zonal Balancing Tank and Approach Road to provide drinking water facility to… — forest land use approved
- Diversion of Forest Land — lapsed
- Construction of ELSR at Benakanawari village in Hunagund Taluka of Bagalkot… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.