Quick answers
What is this project?
Proposed Multi Village Drinking Water Supply Facilities to Shirali and other 30 villages (244 habitations) is a lapsed road project in Anilgod, Honavar, Uttara Kannada, Karnataka. The site covers 21.5 acres.
Who is building it?
The applicant is Department of Irrigation.
Has it been approved?
No. The application was lapsed on 5 Nov 2026, so it is no longer under consideration.
Where is it?
In Anilgod, Honavar, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹240 crore; a site of 21.5 acres and 1.1 acres (0.4 ha) of forest land.
When was it filed?
The application was filed on 20 Jul 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Multi Village Drinking Water Supply Facilities to Shirali and other 30 villages…
Project details
| Official title | Proposed Multi Village Drinking Water Supply Facilities to Shirali and other 30 villages (244 habitations) in Bhatkal taluk and Balkoor and other 36 villages (260 Hbitations) in Honnavara Taluk Uttara Kannada District Karnataka-state, Country-India through Design, Build, Operate and Transfer (DBOT) mode Under Jal Jeevan Mission |
|---|---|
| Status | Lapsed |
| Status since | 5 Nov 2026 |
| Application filed | 20 Jul 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Department of Irrigation |
| Land area | 21.5 acres (8.7 ha) |
| Forest land | 1.1 acres (0.4 ha) |
| Project cost | ₹240 crore |
| Village / locality | Anilgod |
| Taluk / tehsil | Honavar |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06610 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Oct 2026 | Under forest review | 21.5 acres | ₹240 crore |
| Change of use filed 20 Jul 2026 (this page) | Lapsed | 21.5 acres | ₹240 crore |
In context
48 applications in Uttara Kannada since January 2022 are in the same category (Roads & highways): 1 approved, 21 filed or under review, and 24 withdrawn, lapsed or rejected. At 21.5 acres, this one is larger than 80% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Anilgod, Honavar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Multi Village Drinking Water Supply Facilities to Shirali and other… — under forest review, 0 m away
- Providing FHTCs to 158 Households in Hosagadde & other 1 Habitation of Kota… — under forest review, 1.1 km away
- Bsnlusof4gsaturationprojectat Kota Village-Ofcroute Isproposedforconnectivity — lapsed, 2 km away
- Bsnlusof4gsaturationprojectat Kota Village-Ofcroute Isproposedforconnectivity — forest land use approved, 2 km away
- Bsnlusof4gsaturationprojectat Sampoli Village-Ofcroute Isproposedforconnectivity — lapsed, 2.7 km away
- Bsnlusof4gsaturationprojectat Sampoli Village-Ofcroute Isproposedforconnectivity — forest land use approved, 2.7 km away
- Bsnl 4g Saturation Project Sampoli — lapsed, 2.8 km away
- BSNL 4G Saturation Project Under USOF at KUCHODI of Honnavar Taluk — lapsed, 3.8 km away
More from Department of Irrigation in Uttara Kannada
- Providing FHTCs to 227 Households in Bavuru & other 13 Habitation of Saralagi… — initial checks
- Multi Village Scheme to Karki and Other 19 Villages — under wildlife review
- Providing FHTC's to 1330 Households in Ajjodlu & other 27 Habitation of Kharwa… — under forest review
- Providing FHTC's to 739 Households in Herangadi & other 16 Habitation of… — more information requested
- Providing Fhtc's to 785 Households in Chandavar & Other 13 Habitation of… — more information requested
- Providing FHTC's to 493 Households in Angadimanekeri & other 10 Habitation of… — under forest review
51 Department of Irrigation, Karnataka projects in Uttara Kannada
All 61 Department of Irrigation, Karnataka projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.