Quick answers
What is this project?
Bsnlusof4gsaturationprojectat Kota Village-Ofcroute Isproposedforconnectivity is an approved telecom project in Hadikal, Honavar, Uttara Kannada, Karnataka. The site covers 0.3 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 16 Jun 2025), as of 27 Nov 2026.
Where is it?
In Hadikal, Honavar, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹95 lakh; a site of 0.3 acres and 960 m² of forest land.
When was it filed?
The application was filed on 5 May 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 16 Jun 2025 |
| Application filed | 5 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 1,300 m² |
| Forest land | 960 m² |
| Project cost | ₹95 lakh |
| Village / locality | Hadikal |
| Taluk / tehsil | Honavar |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06660 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 5 Jul 2024 | Lapsed | 0.3 acres | ₹95 lakh |
| New project filed 5 May 2024 (this page) | Forest land use approved | 0.3 acres | ₹95 lakh |
In context
529 applications in Uttara Kannada since January 2022 are in the same category (Telecom): 181 approved, 43 filed or under review, and 277 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 0.3 acres, this one is larger than 62% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hadikal, Honavar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnlusof4gsaturationprojectat Kota Village-Ofcroute Isproposedforconnectivity — lapsed, 0 m away
- Providing FHTCs to 158 Households in Hosagadde & other 1 Habitation of Kota… — under forest review, 1.5 km away
- Proposed Multi Village Drinking Water Supply Facilities to Shirali and other… — under forest review, 2 km away
- Proposed Multi Village Drinking Water Supply Facilities to Shirali and other… — lapsed, 2 km away
- Providing FHTC s to 1391 Households by New MVS to Bailur Village in Bailur GP… — lapsed, 3.2 km away
- Bsnlusof4gsaturationprojectat Sampoli Village-Ofcroute Isproposedforconnectivity — lapsed, 3.5 km away
- Bsnlusof4gsaturationprojectat Sampoli Village-Ofcroute Isproposedforconnectivity — forest land use approved, 3.5 km away
- Bsnl 4g Saturation Project Sampoli — lapsed, 3.5 km away
More from Mahesh Nair in Uttara Kannada
- Bsnl 4g Saturation Project Underground Optical Fiber Laying for Kanur,… — initial checks
- Optical Fiber Cable Laying Under 4g Satuaration Project for Achave Kuntakani… — under wildlife review
- Bsnl Usof 4g Saturation Project — under forest review
- Bsnl 4g Saturation Project Ofc Route Veeranjol, Palada, Vatla Form E — under forest review
- Optical Fiber Cable Laying by Bharath Sanchar Nigam LTD for Connectivity to 4g… — more information requested
- Bsnl 4g Saturation Tower Project Ofc Route Aveda Popalwadi — under forest review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.