What is Developing? Open the mapMap

Under forest reviewWater & irrigation · Uttara Kannada, Karnataka

Drinking Water Supply to Vasar Kudrige and Other 22 Villages of Ankola Taluk, Uttar Kannada District, Karnataka Through Design Built Operate and Transfer (Dbot) Mode Under Multi Village Drinking Water Supply Scheme

Drinking Water Supply to Vasar Kudrige and Other 22 Villages of Ankola Taluk, Uttar Kannada District, Karnataka Through Design Built Operate and Transfer (Dbot) Mode Under Multi Village Drinking Water Supply Scheme is a proposed water and irrigation project in Belse, Ankola, Uttara Kannada, Karnataka. The site covers 9.9 acres. Its stated project cost is ₹100 crore. As of 27 Nov 2026, its status is “Under forest review” (since 19 Nov 2026).

See it on the live map All projects in Uttara Kannada

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Drinking Water Supply to Vasar Kudrige and Other 22 Villages of Ankola Taluk, Uttar Kannada District, Karnataka Through Design Built Operate and Transfer (Dbot) Mode Under Multi Village Drinking Water Supply Scheme is a proposed water and irrigation project in Belse, Ankola, Uttara Kannada, Karnataka. The site covers 9.9 acres.

Who is building it?

The applicant is Department of Irrigation.

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Belse, Ankola, Uttara Kannada, Karnataka.

How big is it?

It has a stated cost of ₹100 crore; a site of 9.9 acres and 4.2 acres (1.7 ha) of forest land.

When was it filed?

The application was filed on 7 May 2025.

Project details

StatusUnder forest review
Status since19 Nov 2026
Application filed7 May 2025
Approval soughtForest land use
Application typeNew project
SectorWater & irrigation
ApplicantDepartment of Irrigation
Land area9.9 acres (4 ha)
Forest land4.2 acres (1.7 ha)
Project cost₹100 crore
Village / localityBelse
Taluk / tehsilAnkola
DistrictUttara Kannada
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-06780

In context

63 applications in Uttara Kannada since January 2022 are in the same category (Water & irrigation): 2 approved, 48 filed or under review, and 13 withdrawn, lapsed or rejected. At 9.9 acres, this one is larger than 76% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Belse, Ankola, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Department of Irrigation in Uttara Kannada

51 Department of Irrigation, Karnataka projects in Uttara Kannada
All 61 Department of Irrigation, Karnataka projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.