One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 0.1066 ha forest land in Sy No. 1 of Cheelandavadi Village, Uyyambali…
Project details
| Official title | Diversion of 0.1066 ha forest land in Sy No. 1 of Cheelandavadi Village, Uyyambali Hobli, Kanakapura Taluk, Ramanagara District, Cauvery Wildlife Division for laying of 66 KV UG Cable along with Road passing through SF and Cauvery Wild Sanctuary Protected area [From existing 66/11 KV Doddalahalli Sub-Station to Proposed 66/11KV Hegganur Sub-Station] in favour of the Executive Engineer (Elec), Major Works Division, KPTCL, Ramanagara |
|---|---|
| Status | Lapsed |
| Status since | 15 Feb 2026 |
| Application filed | 8 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Karnataka Power Transmission Corporation Limited |
| Land area | 52.1 acres (21.1 ha) |
| Forest land | 1,070 m² |
| Project cost | ₹9.9 crore |
| Village / locality | Cheelandvadi |
| Taluk / tehsil | Kanakapura |
| District | Ramanagara |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-06790 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Jan 2024 (this page) | Lapsed | 52.1 acres | ₹9.9 crore |
| New project filed 18 Oct 2023 | More information requested | 52.1 acres | ₹9.9 crore |
In context
22 applications in Ramanagara since January 2022 are in the same category (Buildings & townships): 10 approved, 6 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 52.1 acres, this one is larger than 64% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Cheelandvadi, Kanakapura, Ramanagara, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.1066 ha forest land in Sy No. 1 of Cheelandavadi Village,… — more information requested, 0 m away
- Diversion of 0.1066 Ha of Wild sanctuary protected land for laying 132/66kV… — decision issued, 0 m away
- Diversion of 0.1066 Ha of Wild sanctuary protected land for laying 132/66kV… — initial checks, 0 m away
- Laying of Underground OFC Cable to the Proposed 4G Saturation Site at Hoolya. — under wildlife review, 1.5 km away
- Laying of Underground OFC Cable to the Proposed 4G Saturation Site at Hoolya. — initial checks, 1.5 km away
- Laying of Underground OFC Cable to the Proposed 4G Saturation Site at Hoolya. — initial checks, 1.8 km away
- Laying of Underground OFC Cable to the Proposed 4G Saturation Site at Hoolya. — more information requested, 1.8 km away
- Ofc Route to Usof 4g Bts (Base Transiver Station )hoolya Saturation Project… — more information requested, 1.8 km away
More from Karnataka Power Transmission Corporation Limited in Ramanagara
- Diverted of 1.8 Ha forest land — lapsed
- Diversion of 0.1066 Ha of Wild sanctuary protected land for laying 132/66kV… — decision issued
- Diversion of 0.1066 Ha of Wild sanctuary protected land for laying 132/66kV… — initial checks
5 Karnataka Power Transmission Corporation projects in Ramanagara
All 32 Karnataka Power Transmission Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.