Quick answers
What is this project?
Diversion of 0.0186 Ha of Forest Land for the Construction of BTS Base Transceiver Station and Installation of Telecom Equipment as part of 4G Saturation Project to Provide 4G Coverage to uncovered Madaravalli (Gobaradahonda) Village, Shikaripura Taluk, Shivamogga District under USO funded 4G Saturation Project is a proposed telecom project in Madaravalli, Shikarpur, Shivamogga, Karnataka. The site covers 0 acres.
Who is building it?
The applicant is Bharat Sanchar Nigam Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Madaravalli, Shikarpur, Shivamogga, Karnataka.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0 acres and 190 m² of forest land.
When was it filed?
The application was filed on 28 Aug 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 28 Aug 2026 |
| Application filed | 28 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharat Sanchar Nigam Limited |
| Land area | 200 m² |
| Forest land | 190 m² |
| Project cost | ₹60 lakh |
| Village / locality | Madaravalli |
| Taluk / tehsil | Shikarpur |
| District | Shivamogga |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-07575 |
In context
102 applications in Shivamogga since January 2022 are in the same category (Telecom): 56 approved, 19 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 14 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Madaravalli, Shikarpur, Shivamogga, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0186 Ha of Forest Land for the Construction of BTS Base… — forest land use approved, 3.3 km away
- Diversion of 0.0186 Ha of Forest Land for the Construction of BTS Base… — forest land use approved, 5.7 km away
- Diversion of 0.0265 Ha of Forest Land for the Construction of BTS Base… — forest land use approved, 8.8 km away
- Wildlife Clearance for Widening of NH-69 to Four lane from Km 111.500 to Km… — application filed, 10.7 km away
- Widening of NH-69 to Four lane from Km 111.500 to Km 148.089 — under forest review, 10.8 km away
- Building Stone Quarry "Smt. Pyarijan" — under environmental review, 11.9 km away
- Diversion of Forest Land for Providing Drinking Water supply Facilities to… — in-principle approval, conditions pending, 12.2 km away
- Diversion of 0.0188 Ha of Forest Land for the Construction of BTS Base… — forest land use approved, 12.5 km away
More from Bharat Sanchar Nigam Limited in Shivamogga
- Diversion of 0.0186 Ha of Forest Land for the Construction of BTS Base… — under wildlife review
- Diversion of 0.0186 Ha of Forest Land for the Construction of BTS Base… — initial checks
- Diversion of 0.0186 Ha of Forest Land for the Construction of BTS Base… — under forest review
- Diversion of 0.0186 Ha of Forest Land for the Construction of BTS Base… — more information requested
- Diversion of 0.0186 Ha of Forest Land for the Construction of BTS Base… — under forest review
- Diversion of 0.0186 Ha of Forest Land for the Construction of BTS Base… — initial checks
134 Bharat Sanchar Nigam (BSNL) projects in Shivamogga
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.