Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 4 Jan 2025 |
| Application filed | 27 Nov 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Minor Irrigation and Ground Water Development Subdivision |
| Use | Other |
| Project cost | ₹6 crore |
| Village / locality | Kote |
| Taluk / tehsil | Kapu |
| District | Udupi |
| State | Karnataka |
| Location from | Site area on record |
| Our reference | WID-KA-08185 |
In context
139 applications in Udupi since January 2022 are in the same category (Buildings & townships): 40 approved, 31 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kote, Kapu, Udupi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction of Etp — lapsed, 250 m away
- Reconstruction of Residential House at sy No 194/24 of Udyavara Village — coastal clearance granted, 450 m away
- Treated Water Disposal Pipeline — lapsed, 800 m away
- River Protection Works near Sathish Amin and Sarasu Poojary's House at… — coastal clearance granted, 900 m away
- Construction of residential House by Lavina Oberoi — lapsed, 900 m away
- Construction of Residential House by Sunitha Thingalaya — lapsed, 1000 m away
- Construction of Residential House by P N Vandana Rao — lapsed, 1 km away
- Costruction of Residential House — lapsed, 1.2 km away
More from Minor Irrigation and Ground Water Development Subdivision in Udupi
- River Bank protection work near Laxman Mogera House — more information requested
- Improvement works to Salt Water Exclusion Dam at Beskuru, construction of Salt… — more information requested
- Riverbank Protection Work — coastal clearance granted
- Kharland at Selected Reaches of Gangolli River From Santhosh Nagar to… — coastal clearance granted
- Kharland at Selected stretches from Holekere Temple to Bagwadi bridge and at… — coastal clearance granted
- Construction of Swed at Hosahithlu Kirimajeshwara — coastal clearance granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.