Quick answers
What is this project?
CRZ clearance Construction of Diesel Bunk at Honnavar Fisheries Harbour is an approved port and coastal project in Kasarkod, Honavar, Uttara Kannada, Karnataka. The site covers 0.1 acres.
Who is building it?
The applicant is Karnataka Fisheries Development Corporation Limited.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 9 Dec 2024), as of 27 Nov 2026.
Where is it?
In Kasarkod, Honavar, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹32 lakh and a site of 0.1 acres.
When was it filed?
The application was filed on 14 Feb 2024.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 9 Dec 2024 |
| Application filed | 14 Feb 2024 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Karnataka Fisheries Development Corporation Limited |
| Land area | 300 m² |
| Project cost | ₹32 lakh |
| Village / locality | Kasarkod |
| Taluk / tehsil | Honavar |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08486 |
In context
19 applications in Uttara Kannada since January 2022 are in the same category (Ports & coast): 9 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.1 acres, this one is smaller than 100% of them.
31 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kasarkod, Honavar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Barge/vessel loading facility to handle 4.9 MTPA of cargo at Coastal Sand… — under coastal review, 350 m away
- Improvement to Existing Kaccha Road and Usage of the Kaccha Road Along the Sea… — more information requested, 350 m away
- Proposed Four Laning of Honnavar Port Connectivity Road From 0.00 (Kasarkod… — lapsed, 600 m away
- 4 Lane Dedicated Road Corridor From NH 66 to Provide Port Connectivity for the… — lapsed, 750 m away
- Land for STP Construction under SBM 2.0 — lapsed, 1.2 km away
- Renovation of the Existing Kitchen Building — lapsed, 1.3 km away
- Shree Kadrinatheshwara Petro Park — lapsed, 1.5 km away
- For construction of Fuel Pump and Approach Road — lapsed, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.