Quick answers
What is Land for STP Construction under SBM 2.0?
Land for STP Construction under SBM 2.0 is a lapsed waste management project in Honnavara, Honavar, Uttara Kannada, Karnataka. The site covers 0.3 acres.
Who is building it?
The applicant is Town Panchayat Honnavar.
Has it been approved?
No. The application was lapsed on 27 Jul 2026, so it is no longer under consideration.
Where is it?
In Honnavara, Honavar, Uttara Kannada, Karnataka.
How big is it?
It has a stated cost of ₹2.9 crore and a site of 0.3 acres.
When was it filed?
The application was filed on 12 May 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 27 Jul 2026 |
| Application filed | 12 May 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Waste management |
| Applicant | Town Panchayat Honnavar |
| Land area | 1,200 m² |
| Project cost | ₹2.9 crore |
| Village / locality | Honnavara |
| Taluk / tehsil | Honavar |
| District | Uttara Kannada |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-08567 |
In context
12 applications in Uttara Kannada since January 2022 are in the same category (Waste management): 0 approved, 1 filed or under review, and 11 withdrawn, lapsed or rejected. At 0.3 acres, this one is smaller than 75% of them.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Honnavara, Honavar, Uttara Kannada, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Barge/vessel loading facility to handle 4.9 MTPA of cargo at Coastal Sand… — environmental approval granted, 1 km away
- Barge/vessel loading facility to handle 4.9 MTPA of cargo at Coastal Sand… — coastal clearance granted, 1 km away
- Barge/vessel loading facility to handle 4.9 MTPA of cargo at Coastal Sand… — cleared for impact study, 1 km away
- CRZ clearance Construction of Diesel Bunk at Honnavar Fisheries Harbour — coastal clearance granted, 1.2 km away
- Improvement to Existing Kaccha Road and Usage of the Kaccha Road Along the Sea… — more information requested, 1.5 km away
- Barge/vessel loading facility to handle 4.9 MTPA of cargo at Coastal Sand… — under coastal review, 1.6 km away
- Proposed Four Laning of Honnavar Port Connectivity Road From 0.00 (Kasarkod… — lapsed, 1.8 km away
- 4 Lane Dedicated Road Corridor From NH 66 to Provide Port Connectivity for the… — lapsed, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.