What is Developing? Open the mapMap

More information requestedBuildings & townships · Bengaluru Rural, Karnataka

Construction of Residential Row Houses with Club House by Isha Properties

This proposed building project by Isha Properties is in Mutkur, Hosakote, Bengaluru Rural, Karnataka. The site covers 23.5 acres. Its stated project cost is ₹200 crore. As of 27 Nov 2026, its status is “More information requested” (since 24 Nov 2026).

See it on the live map All projects in Bengaluru Rural

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleConstruction of Residential Row Houses with Club House
StatusMore information requested
Status since24 Nov 2026
Application filed7 Nov 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantIsha Properties
Land area23.5 acres (9.5 ha)
Project cost₹200 crore
Village / localityMutkur
Taluk / tehsilHosakote
DistrictBengaluru Rural
StateKarnataka
Location fromSite boundary on record
Our referenceWID-KA-08800

What the filings say

What is planned

Isha Properties proposes to construct a residential development consisting of row houses and a club house across a total site area of 9.5 hectares (23.5 acres). The project is located in Muthkuru village, Bengaluru Rural district. The development is planned as a new project with a total built-up area of 97,810.49 square metres.

The project comprises 371 residential units distributed across 28 blocks (Blocks A to Y, P’, and A’). Each residential block is configured with a ground floor plus two upper floors and a terrace floor. The club house is designed with a ground floor and two upper floors. The maximum height of the residential buildings is proposed at 11.55 metres.

Land Use and Layout

The net plot area for development is 8.39 hectares (20.72 acres), after accounting for 1,599.49 square metres for road widening. The applicant has allocated the land as follows:

Water, Power and Access

During the operation phase, the total water requirement is estimated at 301 KLD, which will be sourced from borewells. The applicant intends to use tankers during the summer months (March to June) if borewell yield is insufficient. A dual plumbing system will be implemented to use treated water for flushing and gardening.

Power requirement for the project is estimated at 2,326 KW, to be supplied by the Bangalore Electricity Supply Company (BESCOM). For backup, the applicant proposes to install two diesel generator (DG) sets with a capacity of 250 KVA each. Solar energy measures include solar water heaters, solar street lighting, and LED fixtures, which are expected to achieve a 26% energy saving.

Parking is planned for 840 cars, which includes 742 spaces for residents (two per unit), 24 for visitors, and 74 for the club house. The project site is connected by a 12-metre wide internal road network.

Environmental Safeguards

The project will generate approximately 241 KLD of sewage, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 300 KLD using Sequencing Batch Reactor (SBR) technology. Treated water will be reused for landscaping (111 KLD) and toilet flushing (100 KLD).

Solid waste management plans include:

For rainwater harvesting, the applicant proposes four collection tanks with a capacity of 100 cubic metres each for rooftop runoff. Additionally, 371 recharge pits (one for each house) are planned to manage storm water. The applicant states that 1,190 new trees will be planted on the site, as no trees currently exist on the barren land.

Timeline and Cost

The total project cost is estimated at ‡200 crore, which includes ‡80 crore for land and ‡120 crore for construction. The applicant expects to complete the project within two years of commencement. A budget of ‡22.7 lakh is allocated for environmental management during the construction phase, and ‡43.2 lakh per year for the operation phase. Corporate Environmental Responsibility (CER) activities, including lake beautification and road construction, are budgeted at ‡2 crore over a four-year implementation period.

Isha Properties Construction of Residential Row Houses with Club House site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Isha Properties Construction of Residential Row Houses with Club House: Master layout plan: row house blocks, club house, and internal driveways (preview)🔒 Sign in free to see it
Master layout plan: row house blocks, club house, and internal driveways
Isha Properties Construction of Residential Row Houses with Club House: Project fact sheet with land use and area statements (preview)🔒 Sign in free to see it
Project fact sheet with land use and area statements
Isha Properties Construction of Residential Row Houses with Club House: Water balance chart for non-monsoon season (preview)🔒 Sign in free to see it
Water balance chart for non-monsoon season
Isha Properties Construction of Residential Row Houses with Club House: Proposed Sewage Treatment Plant (STP) design flow (preview)🔒 Sign in free to see it
Proposed Sewage Treatment Plant (STP) design flow

In context

187 applications in Bengaluru Rural since January 2022 are in the same category (Buildings & townships): 138 approved, 29 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 23.5 acres, this one is larger than 65% of them.

36 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mutkur, Hosakote, Bengaluru Rural, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.