Quick answers
What is Laterite Building Stone Quarry Project of Vijayan. H?
Laterite Building Stone Quarry Project of Vijayan. H is an approved mining project in Adur, Kasaragod, Kerala. The site covers 0.2 acres.
Who is building it?
The applicant is Hosadevasthana Vijayan.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Dec 2023), as of 27 Nov 2026.
Where is it?
In Adur, Kasaragod, Kerala.
How big is it?
It has a stated cost of ₹10 lakh and a site of 0.2 acres.
When was it filed?
The application was filed on 22 Dec 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Dec 2023 |
| Application filed | 22 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Hosadevasthana Vijayan |
| Land area | 1,000 m² |
| Project cost | ₹10 lakh |
| Village / locality | Adur |
| Taluk / tehsil | Kasaragod |
| District | Kasaragod |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-00017 |
In context
64 applications in Kasaragod since January 2022 are in the same category (Mining): 22 approved, 28 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.2 acres, this one is smaller than 100% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Adur, Kasaragod, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- BSNL Enterprise Business for Kerala Gramin Bank — forest land use approved, 5 km away
- BSNL Enterprise Business for Kerala Gramin Bank — lapsed, 5 km away
- Construction of Ug Cable From Parappa Depot to Mayyala — more information requested, 5 km away
- Pmgsy IV, Kalladka-Derkaje Road — initial checks, 7.2 km away
- Laterite Building Stone Quarry of Mr. Bijesh T T — under environmental review, 7.6 km away
- Saturation 4G Project USOF/DoT BSNL Kannur BA Kasaragod District — lapsed, 7.8 km away
- Laterite Building Stone Quarry of Damodara M — under environmental review, 8.1 km away
- 4G Saturation Project-USOF DoT BSNL Kannur BA Kasaragod District — forest land use approved, 8.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.