What is Laterite Building Stone Quarry of Sri. Illyas.M?
Laterite Building Stone Quarry of Sri. Illyas.M is an approved mining project in Vazhayur, Kondotty, Malappuram, Kerala. The site covers 2 acres.
Who is building it?
The applicant is Illyas M.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Feb 2025), as of 27 Nov 2026.
Where is it?
In Vazhayur, Kondotty, Malappuram, Kerala.
How big is it?
It has a stated cost of ₹50 lakh and a site of 2 acres.
When was it filed?
The application was filed on 5 Jul 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Feb 2025 |
| Application filed | 5 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Illyas M |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Vazhayur |
| Taluk / tehsil | Kondotty |
| District | Malappuram |
| State | Kerala |
| Location from | Site area on record |
| Our reference | WID-KL-00636 |
In context
335 applications in Malappuram since January 2022 are in the same category (Mining): 125 approved, 143 filed or under review, and 67 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 2 acres, this one is smaller than 71% of them.
No other mining lease on record is within 500 m of this site; 10 have applied within 5 km.
Where it is
Vazhayur, Kondotty, Malappuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- LATERITE BUILDING STONE QUARRY OF Mr. NOUFAL M.K — environmental approval granted, 700 m away
- Laterite Building Stone Quarry of Musthafa — environmental approval granted, 1.3 km away
- Expansion at SAFI campus — under environmental review, 1.8 km away
- Mohammed.K — initial checks, 2.7 km away
- Granite Building Stone Quarry of Secure Sands — lapsed, 3.1 km away
- LATERITE BUILDING STONE QUARRY OF Mr. MUHAMMED AFSAL.T — environmental approval granted, 3.6 km away
- Laterite Building Stone Quarry of Mr. Ayyappan. A — environmental approval granted, 4 km away
- Abdul Nazar — lapsed, 4.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.