Quick answers
What is Expansion at SAFI campus?
Expansion at SAFI campus is a proposed building project in Vazhayur, Kondotty, Malappuram, Kerala. The site covers 48.4 acres.
Who is building it?
The applicant is Safi.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Vazhayur, Kondotty, Malappuram, Kerala.
How big is it?
It has a stated cost of ₹30.6 crore and a site of 48.4 acres.
When was it filed?
The application was filed on 7 Aug 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Oct 2026 |
| Application filed | 7 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Safi |
| Land area | 48.4 acres (19.6 ha) |
| Project cost | ₹30.6 crore |
| Village / locality | Vazhayur |
| Taluk / tehsil | Kondotty |
| District | Malappuram |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01289 |
In context
12 applications in Malappuram since January 2022 are in the same category (Buildings & townships): 6 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. At 48.4 acres, this one is larger than 92% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vazhayur, Kondotty, Malappuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mohammed.K — initial checks, 1.1 km away
- Granite Building Stone Quarry of Secure Sands — lapsed, 1.6 km away
- Laterite Building Stone Quarry of Sri. Illyas.M — environmental approval granted, 1.8 km away
- LATERITE BUILDING STONE QUARRY OF Mr. NOUFAL M.K — environmental approval granted, 1.9 km away
- Laterite Building Stone Quarry of Musthafa — environmental approval granted, 2.8 km away
- LATERITE BUILDING STONE QUARRY OF Mr. MUHAMMED AFSAL.T — environmental approval granted, 3.1 km away
- Laterite Building Stone Quarry of Mr. KA Rauf Sy No.299/3, 299/4, 299/5-1 — under environmental review, 3.5 km away
- Laterite Building Stone Quarry of Mr. KA Rauf — lapsed, 3.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.