Quick answers
What is this project?
Environmental Clearance for the proposed Commercial cum Hospital cum Residential Building Construction Project jointly to be developed by Mr. Abdul Jaleel, Mr. Muhammed Musthafa & Mr. Abdul Rasheed is an approved mixed-use project in Edarikode, Tirurangadi, Malappuram, Kerala. It plans 36 units in 1 tower of up to 9 floors on 2 acres.
Who is building it?
The applicant is Abdul Jaleel.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Nov 2025), as of 27 Nov 2026.
Where is it?
In Edarikode, Tirurangadi, Malappuram, Kerala.
How big is it?
It has a stated cost of ₹49.7 crore and a site of 2 acres.
When was it filed?
The application was filed on 19 Mar 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Nov 2025 |
| Application filed | 19 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Abdul Jaleel |
| Use | Mixed use |
| Units | 36 |
| Towers | 1 |
| Floors (tallest) | 9 |
| Basements | 1 |
| Height | 35 m |
| Parking spaces | 547 |
| Land area | 2 acres (0.8 ha) |
| Built-up area | 28,310 m² (3,04,726 sq ft) |
| Plot area | 7,895 m² (84,981 sq ft) |
| Project cost | ₹49.7 crore |
| Village / locality | Edarikode |
| Taluk / tehsil | Tirurangadi |
| District | Malappuram |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-00886 |
In context
12 applications in Malappuram since January 2022 are in the same category (Buildings & townships): 6 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. At 2 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Edarikode, Tirurangadi, Malappuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed additional construction within M/s. Al Madeena Institute of Medical… — not approved, 300 m away
- Laterite Building Stone Quarry of Moidutty Haji — lapsed, 6.4 km away
- Laterite Building Stone Quarry of Pullanipuram Sekkeeb — environmental approval granted, 6.6 km away
- Laterite Building Stone Quarry of Abdul Gafoor — environmental approval granted, 7 km away
- Laterite Building Stone Quarry of Sri. Sadique Ali — environmental approval granted, 7.2 km away
- Laterite Building Stone Quarry of Muhammed Ali — environmental approval granted, 7.3 km away
- Laterite Building Stone Quarry of Majeed Kuruniyan — environmental approval granted, 7.4 km away
- Laterite Building stone quarry of Muhammed Ali P — environmental approval granted, 7.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.