Quick answers
What is this project?
Proposed additional construction within M/s. Al Madeena Institute of Medical Science is a rejected hospital project in Kottakkal, Tirur, Malappuram, Kerala. It plans buildings of up to 4 floors on 4.4 acres.
Who is building it?
The applicant is Al Madeena Institute of Medical Science Private Limited.
Has it been approved?
No. The application was rejected on 18 Jul 2026.
Where is it?
In Kottakkal, Tirur, Malappuram, Kerala.
How big is it?
It has a stated cost of ₹42 lakh and a site of 4.4 acres.
When was it filed?
The application was filed on 18 Nov 2025.
Project details
| Status | Not approved |
|---|---|
| Status since | 18 Jul 2026 |
| Application filed | 18 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Al Madeena Institute of Medical Science Private Limited |
| Use | Hospital |
| Floors (tallest) | 4 |
| Land area | 4.4 acres (1.8 ha) |
| Built-up area | 5,284 m² (56,876 sq ft) |
| Project cost | ₹42 lakh |
| Village / locality | Kottakkal |
| Taluk / tehsil | Tirur |
| District | Malappuram |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-00889 |
In context
12 applications in Malappuram since January 2022 are in the same category (Buildings & townships): 6 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. At 4.4 acres, this one is smaller than 58% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kottakkal, Tirur, Malappuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for the proposed Commercial cum Hospital cum… — environmental approval granted, 300 m away
- Laterite Building Stone Quarry of Moidutty Haji — lapsed, 6.6 km away
- Laterite Building Stone Quarry of Pullanipuram Sekkeeb — environmental approval granted, 6.6 km away
- Laterite Building Stone Quarry of Abdul Gafoor — environmental approval granted, 7 km away
- Laterite Building Stone Quarry of Majeed Kuruniyan — environmental approval granted, 7.2 km away
- Laterite Building Stone Quarry of Sri. Sadique Ali — environmental approval granted, 7.4 km away
- Laterite Building Stone Quarry of YASARALI — environmental approval granted, 7.5 km away
- Laterite Building Stone Quarry of Muhammed Ali — environmental approval granted, 7.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.