Quick answers
What is KIIFB Project from Kattadikadavu to Munderi Seed Farm Gate?
KIIFB Project from Kattadikadavu to Munderi Seed Farm Gate is a lapsed road project in Chungattara, Nilambur, Malappuram, Kerala. The site covers 0.4 acres.
Who is building it?
The applicant is Executive Engineer, Krfb-Pmu, Ernakulam/Thrissur.
Has it been approved?
No. The application was lapsed on 23 Sept 2026, so it is no longer under consideration.
Where is it?
In Chungattara, Nilambur, Malappuram, Kerala.
How big is it?
It has a stated cost of ₹61.4 crore; a site of 0.4 acres and 1.8 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 18 Jul 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Sept 2026 |
| Application filed | 18 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer, Krfb-Pmu, Ernakulam/Thrissur |
| Land area | 1,600 m² |
| Forest land | 1.8 acres (0.7 ha) |
| Project cost | ₹61.4 crore |
| Village / locality | Chungattara |
| Taluk / tehsil | Nilambur |
| District | Malappuram |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-02050 |
In context
8 applications in Malappuram since January 2022 are in the same category (Roads & highways): 0 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chungattara, Nilambur, Malappuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- USOF Backhaul Connectivity Site at Ambuttanpotti Malappuram BA — lapsed, 450 m away
- Granite Building Stone Quarry of Arif — lapsed, 5.6 km away
- Ordinary Clay Project of Ummer — lapsed, 8.6 km away
- Laterite Building Stone Quarry of Kunjuneen — returned to applicant, 8.6 km away
- Transfer of Forest Land at Palunda Survey No.1186 to Nilambur Block Panchayath — lapsed, 9.8 km away
- 4G Saturation Project - MalappuramDistrict — more information requested, 10.6 km away
- Renewal of Leasing Out of Forest Land to Daf Chungathara for Existing Pumping… — initial checks, 12.1 km away
- Availing Road Access to the Private Land Through Valluvassery Rf Under… — under forest review, 12.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.