Quick answers
What is this project?
USOF Backhaul Connectivity Site at Ambuttanpotti Malappuram BA is a lapsed telecom project in Edakkara, Nilambur, Malappuram, Kerala. The site covers 0 acres.
Who is building it?
The applicant is Bharat Sanchar Nigam Limited.
Has it been approved?
No. The application was lapsed on 19 Apr 2024, so it is no longer under consideration.
Where is it?
In Edakkara, Nilambur, Malappuram, Kerala.
How big is it?
It has a stated cost of ₹2 crore; a site of 0 acres and 230 m² of forest land.
When was it filed?
The application was filed on 13 Nov 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 Apr 2024 |
| Application filed | 13 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Bharat Sanchar Nigam Limited |
| Land area | 200 m² |
| Forest land | 230 m² |
| Project cost | ₹2 crore |
| Village / locality | Edakkara |
| Taluk / tehsil | Nilambur |
| District | Malappuram |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01736 |
In context
8 applications in Malappuram since January 2022 are in the same category (Telecom): 1 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Edakkara, Nilambur, Malappuram, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- KIIFB Project from Kattadikadavu to Munderi Seed Farm Gate — lapsed, 450 m away
- Granite Building Stone Quarry of Arif — lapsed, 5.5 km away
- Ordinary Clay Project of Ummer — lapsed, 8.2 km away
- Laterite Building Stone Quarry of Kunjuneen — returned to applicant, 8.3 km away
- Transfer of Forest Land at Palunda Survey No.1186 to Nilambur Block Panchayath — lapsed, 9.3 km away
- 4G Saturation Project - MalappuramDistrict — more information requested, 10.6 km away
- Renewal of Leasing Out of Forest Land to Daf Chungathara for Existing Pumping… — initial checks, 11.7 km away
- Availing Road Access to the Private Land Through Valluvassery Rf Under… — under forest review, 12.3 km away
More from Bharat Sanchar Nigam Limited in Malappuram
- 4G Saturation Project at Kalkkund Malappuram District — forest land use approved
- USOF 4G Saturation Project of Category-2 sites(Vattikkallu Tribal Colony,… — lapsed
- 4G Saturation Project - MalappuramDistrict — more information requested
4 Bharat Sanchar Nigam (BSNL) projects in Malappuram
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.