Quick answers
What is this project?
Reconstruction of Basavian Check Dam & Canal System at Mukkali in Bhavani River in Agali Panchayath in Attappady is a proposed water and irrigation project in Padavayal, Mannarkad, Palakkad, Kerala. The site covers 0.1 acres.
Who is building it?
The applicant is Executive Engineer Minor irrigation division palakkad.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Padavayal, Mannarkad, Palakkad, Kerala.
How big is it?
It has a stated cost of ₹11 lakh; a site of 0.1 acres and 250 m² of forest land.
When was it filed?
The application was filed on 28 Jul 2026.
Project details
| Official title | Reconstruction of Basavian Check Dam & Canal System at Mukkali in Bhavani River in Agali Panchayath in Attappady at Palakkad District - Balance Work |
|---|---|
| Status | Initial checks |
| Status since | 28 Jul 2026 |
| Application filed | 28 Jul 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Water & irrigation |
| Applicant | Executive Engineer Minor irrigation division palakkad |
| Land area | 300 m² |
| Forest land | 250 m² |
| Project cost | ₹11 lakh |
| Village / locality | Padavayal |
| Taluk / tehsil | Mannarkad |
| District | Palakkad |
| State | Kerala |
| Location from | Site area on record |
| Our reference | WID-KL-02221 |
In context
64 applications in Palakkad since January 2022 are in the same category (Water & irrigation): 44 approved, 8 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 0.1 acres, this one is smaller than 55% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Padavayal, Mannarkad, Palakkad, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Providing 4G/5G coverage to Uncovered villages- Silent valley — more information requested, 2.7 km away
- Providing 4G/5G coverage to Uncovered villages- Silent valley — in-principle approval, conditions pending, 2.7 km away
- ATTAPPADY GREEN ENERGY CORRIDOR PROJECT-220 kV LINE FROM VETTATHUR TO AGALI… — more information requested, 4.8 km away
- ATTAPPADY GREEN ENERGY CORRIDOR PROJECT-220 kV LINE FROM VETTATHUR TO AGALI… — more information requested, 4.8 km away
- Attappady Green Energy Corridor Project-220kV line from Vettathur to… — lapsed, 5.1 km away
- ATTAPPADY GREEN ENERGY CORRIDOR PROJECT-220kV LINE FROM VETTATHUR TO… — lapsed, 5.1 km away
- Lift Irrigation scheme for Nellipathy Mettuvazhy Sarangamala Payara Area in… — initial checks, 12.4 km away
- Proposed Commercial Complex project of M/s HiLITE Properties Pvt. Ltd — under wildlife review, 14.6 km away
More from Executive Engineer Minor irrigation division palakkad in Palakkad
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.