Quick answers
What is this project?
ATTAPPADY GREEN ENERGY CORRIDOR PROJECT-220 kV LINE FROM VETTATHUR TO AGALI VIA MANNARKKAD SUBSTATION is a proposed power project in Ananellur Ii, Mannarkad, Palakkad, Kerala. The site covers 16 acres.
Who is building it?
The applicant is Jansha M.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Ananellur Ii, Mannarkad, Palakkad, Kerala.
How big is it?
It has a stated cost of ₹311.1 crore; a site of 16 acres and 16.5 acres (6.7 ha) of forest land.
When was it filed?
The application was filed on 7 Apr 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 30 Jun 2026 |
| Application filed | 7 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Jansha M |
| Land area | 16 acres (6.5 ha) |
| Forest land | 16.5 acres (6.7 ha) |
| Project cost | ₹311.1 crore |
| Village / locality | Ananellur Ii |
| Taluk / tehsil | Mannarkad |
| District | Palakkad |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-02069 |
In context
8 applications in Palakkad since January 2022 are in the same category (Power): 1 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ananellur Ii, Mannarkad, Palakkad, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- ATTAPPADY GREEN ENERGY CORRIDOR PROJECT-220 kV LINE FROM VETTATHUR TO AGALI… — more information requested, 0 m away
- Attappady Green Energy Corridor Project-220kV line from Vettathur to… — lapsed, 1.1 km away
- ATTAPPADY GREEN ENERGY CORRIDOR PROJECT-220kV LINE FROM VETTATHUR TO… — lapsed, 1.1 km away
- Reconstruction of Basavian Check Dam & Canal System at Mukkali in Bhavani… — initial checks, 4.8 km away
- Providing 4G/5G coverage to Uncovered villages- Silent valley — more information requested, 7.5 km away
- Providing 4G/5G coverage to Uncovered villages- Silent valley — in-principle approval, conditions pending, 7.5 km away
- Lift Irrigation scheme for Nellipathy Mettuvazhy Sarangamala Payara Area in… — initial checks, 10.7 km away
- Attle-Ii Small Hydroelectric Project (6 MW) — lapsed, 11.4 km away
More from Jansha M in Palakkad
- ATTAPPADY GREEN ENERGY CORRIDOR PROJECT-220 kV LINE FROM VETTATHUR TO AGALI… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.