Quick answers
What is Ullunkal Hydro Electric Project?
Ullunkal Hydro Electric Project is a proposed water and irrigation project in Perunadu, Ranni, Pathanamthitta, Kerala. The site covers 16.5 acres.
Who is building it?
The applicant is Edcl Power Projects Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Perunadu, Ranni, Pathanamthitta, Kerala.
How big is it?
It has a stated cost of ₹43 lakh; a site of 16.5 acres and 4.5 acres (1.8 ha) of forest land.
When was it filed?
The application was filed on 23 Nov 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 23 Nov 2026 |
| Approval sought | Forest land use |
| Application type | Renewal |
| Sector | Water & irrigation |
| Applicant | Edcl Power Projects Limited |
| Land area | 16.5 acres (6.7 ha) |
| Forest land | 4.5 acres (1.8 ha) |
| Project cost | ₹43 lakh |
| Village / locality | Perunadu |
| Taluk / tehsil | Ranni |
| District | Pathanamthitta |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-02618 |
In context
8 applications in Pathanamthitta since January 2022 are in the same category (Water & irrigation): 2 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Perunadu, Ranni, Pathanamthitta, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sabari Lines Package - Construction of 220KV Double circuit line from Valupara… — in-principle approval, conditions pending, 2.8 km away
- Karikayam Arattukadavu Road — not approved, 5 km away
- Karikayam Arattukadavu Road — lapsed, 5 km away
- Karikayam Arattukadavu Road — lapsed, 5 km away
- 4g Saturation Project for Uncoverd Villages of Pathnamthitta — in-principle approval, conditions pending, 5.3 km away
- Ahpl — lapsed, 5.5 km away
- Ahpl — under forest review, 5.5 km away
- 4g Saturation Project at Kudapanna — forest land use approved, 7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.