Quick answers
What is 4g Saturation Project for Uncoverd Villages of Pathnamthitta?
4g Saturation Project for Uncoverd Villages of Pathnamthitta is a proposed telecom project in Aruvapalam, Konni, Pathanamthitta, Kerala. The site covers 0.1 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Aruvapalam, Konni, Pathanamthitta, Kerala.
How big is it?
It has a stated cost of ₹75 lakh; a site of 0.1 acres and 1,800 m² of forest land.
When was it filed?
The application was filed on 28 Oct 2022.
Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 28 Jun 2023 |
| Application filed | 28 Oct 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 400 m² |
| Forest land | 1,800 m² |
| Project cost | ₹75 lakh |
| Village / locality | Aruvapalam |
| Taluk / tehsil | Konni |
| District | Pathanamthitta |
| State | Kerala |
| Location from | Site boundary on record |
| Our reference | WID-KL-01905 |
In context
12 applications in Pathanamthitta since January 2022 are in the same category (Telecom): 4 approved, 5 filed or under review, and 3 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aruvapalam, Konni, Pathanamthitta, Kerala. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thannithode Estate Lease renewal — lapsed, 2.3 km away
- 4g Saturation Project at Kudapanna — forest land use approved, 5.3 km away
- Ullunkal Hydro Electric Project — initial checks, 5.3 km away
- DEPOSIT-Peruvali Water Supply Project - Water Supply Scheme to… — lapsed, 5.5 km away
- Visibility Board for Bodhi Trust :"I LOVE THANNOTHODE" — lapsed, 5.9 km away
- DEPOSIT-Peruvali Water Supply Project - Water Supply Scheme to… — in-principle approval, conditions pending, 6.1 km away
- Sabari Lines Package - Construction of 220KV Double circuit line from Valupara… — in-principle approval, conditions pending, 6.1 km away
- Karikayam Arattukadavu Road — not approved, 6.7 km away
More from Mahesh Nair in Pathanamthitta
- Laying OFC from Maneera to Kokkathode BTS — initial checks
- MAST ( small tower ) of 15 mtrs on Roof Top of Elavumkal Forest Check Post — more information requested
- Replacement of OFC from Chalakayam to Sabarimala — forest land use approved
- Laying of OFC from Moozhiyaar to Kakki — lapsed