Quick answers
What is 4G Saturation Project at Village 122 RCC ITBP?
4G Saturation Project at Village 122 RCC ITBP is a proposed building project in Na, Leh, Ladakh. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Na, Leh, Ladakh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 0 acres.
When was it filed?
The application was filed on 9 Jul 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 9 Jul 2026 |
| Application filed | 9 Jul 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹25 lakh |
| Village / locality | Na |
| Taluk / tehsil | Leh |
| District | Leh |
| State | Ladakh |
| Location from | Site boundary on record |
| Our reference | WID-LA-00294 |
In context
31 applications in Leh since January 2022 are in the same category (Buildings & townships): 0 approved, 28 filed or under review, and 1 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
Where it is
Na, Leh, Ladakh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ug Cavern at Loma — more information requested, 6.6 km away
- Underground Cavern at Loma — more information requested, 6.6 km away
- Installation of Mobile Tower at Rangoo Leh Ladakh — more information requested, 9.4 km away
- Diversion of 0.0225 Ha. of Wildlife Land for Construction of Mobile Tower for… — more information requested, 9.4 km away
- 4G Saturation Project Near Cooperative Shops Rongo — more information requested, 9.5 km away
- 66/11kV Koyoul, Chushool, Nidder, Hanley Substation under Loss reduction works… — more information requested, 9.5 km away
- 11 kV TRANSMISSION LINE ERECTION FROM NIDDER(NYOMA)- BRIGADE ARMY,… — under wildlife review, 12.5 km away
- Construction of Mudh-Tsaga Road From Km 0.000 to Km 54.000 — more information requested, 13.5 km away
More from Mahesh Nair in Leh
- 4G Saturation Project at Sumdo — more information requested
- 4G Saturation Project at Puga — more information requested
- 4G Saturation Project at Mahe Bridge — more information requested
- 4G Saturation Project at Murgo Army 54 — more information requested
- 4G Saturation Project at Between Khalsar and Partapur — more information requested
- 4G Saturation Project at Anley — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.