Project details
| Official title | Environmental Clearance for Basalt Stone Mining Project (Area 1.20 ha) at Gut No. 164 Part Village Vadale, Taluka Deola, District Nashik, Maharashtra by Shri. Yogesh Shankar Rao Patil, Shri. Suryakant Shankar Rao Patil |
|---|---|
| Status | Environmental approval granted |
| Status since | 27 Oct 2022 |
| Application filed | 27 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Suryakant Patil |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Varhale |
| Taluk / tehsil | Deola |
| District | Nashik |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-00193 |
In context
195 applications in Nashik since January 2022 are in the same category (Mining): 137 approved, 16 filed or under review, and 42 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 66% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Varhale, Deola, Nashik, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Manufacturing Unit of Fruit Base Distillery Plant by M/s. Rajdheer… — returned to applicant, 5.5 km away
- Proposed Manufacturing Unit of Fruit Base Distillery Plant by M/s. Rajdheer… — cleared for impact study, 5.5 km away
- Proposed Manufacturing Unit of Fruit Base Distillery Plant — environmental approval granted, 5.5 km away
- Proposed Manufacturing Unit of Fruit Base Distillery Plant — cleared for impact study, 5.5 km away
- Environmental Clearance for Basalt Stone Mining Project (Area 1.10 ha) — environmental approval granted, 11.5 km away
- Environmental Clearance for Stone Quarry Mining Project (Area 1.65 ha) at Gut… — initial checks, 12.5 km away
- Environmental Clearance for Basalt Stone Mining Project (Area 1.60 ha) at Gut… — environmental approval granted, 12.5 km away
- Environment Clearance for Basalt Stone Mining Project (Area 1.14 ha) at Gut… — environmental approval granted, 12.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.