Quick answers
What is this project?
Proposed expansion of S.R. Scheme on Plot bearing C.T.S No. 815 (PT) of Village at Andheri (West), Mumbai for Rehman Baug SRA CHS. by M/s Prime Infrabuildcon Pvt. Ltd is an approved building project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 1.2 acres.
Who is building it?
The applicant is M/S. Prime Infrabuildcon PVT. LTD..
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Jun 2023), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹166.5 crore and a site of 1.2 acres.
When was it filed?
The application was filed on 24 Jun 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Jun 2023 |
| Application filed | 24 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | M/S. Prime Infrabuildcon PVT. LTD. |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹166.5 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-01348 |
In context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.2 acres, this one is smaller than 68% of them.
536 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (10.8 km away).
Other projects nearby
- Proposed Expansion in S.R. Scheme under regulation 33(11) of DCPR-2034 on Plot… — environmental approval granted, 450 m away
- Proposed Expansion in S.R. Scheme under regulation 33(11) of DCPR-2034 on Plot… — environmental approval granted, 450 m away
- Proposed Slum Rehabilitation Scheme(SRA) by Amalgamation of Additional Slum at… — environmental approval granted, 600 m away
- Proposed Redevelopment of Residential Buildings on Plot bearing C.T.S Nos.… — environmental approval granted, 750 m away
- Proposed Redevelopment of Residential Buildings on Plot bearing C.T.S Nos.… — withdrawn, 750 m away
- Proposed Redevelopment of Residential Buildings on Plot bearing C.T.S Nos.… — lapsed, 750 m away
- Proposed IT Park at plot bearing CTS. No. 215A, 215/13 to 215/22, 215/33 to… — environmental approval granted, 900 m away
- Proposed Residential & Commercial Project at S.No. 64, 64/ 1 to 36 Jay Bhavani… — environmental approval granted, 900 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.