Quick answers
What is this project?
Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) is an approved industrial project in Malkup, Parner, Ahmadnagar, Maharashtra. The site covers 39.2 acres.
Who is building it?
The applicant is M/S. Sopanrao Balkrishna Dhasal Agro Products Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Mar 2023), as of 27 Nov 2026.
Where is it?
In Malkup, Parner, Ahmadnagar, Maharashtra.
How big is it?
It has a stated cost of ₹401.7 crore and a site of 39.2 acres.
When was it filed?
The application was filed on 15 Mar 2023.
One of 9 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol)
Project details
| Official title | Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) at Village Malkup, Tal Parner, Dist: Ahmednagar, Maharashtra by M/s. Sopanrao Balkrishna Dhasal Agro products Ltd (SBDAPL). |
|---|---|
| Status | Environmental approval granted |
| Status since | 15 Mar 2023 |
| Application filed | 15 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | M/S. Sopanrao Balkrishna Dhasal Agro Products Limited |
| Land area | 39.2 acres (15.9 ha) |
| Project cost | ₹401.7 crore |
| Village / locality | Malkup |
| Taluk / tehsil | Parner |
| District | Ahmadnagar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-01471 |
All filings for this project
This project has 9 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 14 Feb 2024 | Withdrawn | 39.2 acres | ₹401.7 crore |
| Ownership transfer filed 17 Oct 2023 | Lapsed | 39.2 acres | ₹401.7 crore |
| Ownership transfer filed 21 Sept 2023 | Lapsed | 39.2 acres | ₹401.7 crore |
| Ownership transfer filed 21 Sept 2023 | Environmental approval granted | 39.2 acres | ₹401.7 crore |
| Ownership transfer filed 18 Sept 2023 | Lapsed | 39.2 acres | ₹401.7 crore |
| Ownership transfer filed 18 Sept 2023 | Lapsed | 39.2 acres | ₹401.7 crore |
| Ownership transfer filed 16 Sept 2023 | Lapsed | 39.2 acres | ₹401.7 crore |
| Ownership transfer filed 16 Sept 2023 | Lapsed | 39.2 acres | ₹401.7 crore |
| Expansion filed 15 Mar 2023 (this page) | Environmental approval granted | 39.2 acres | ₹401.7 crore |
In context
62 applications in Ahmadnagar since January 2022 are in the same category (Industry): 36 approved, 14 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 39.2 acres, this one is smaller than 66% of them.
Where it is
Malkup, Parner, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) — withdrawn, 0 m away
- Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) — lapsed, 0 m away
- Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) — lapsed, 0 m away
- Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) — lapsed, 0 m away
- Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) — lapsed, 0 m away
- Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) — lapsed, 0 m away
- Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) — lapsed, 0 m away
- Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) — environmental approval granted, 100 m away
All 9 Sopanrao Balkrishna Dhasal projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.