What is Developing? Open the mapMap

WithdrawnIndustry · Ahmadnagar, Maharashtra

Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol)

Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) is a withdrawn industrial project in Malkup, Parner, Ahmadnagar, Maharashtra. The site covers 39.2 acres. Its stated project cost is ₹401.7 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 14 Feb 2024).

See it on the live map All projects in Ahmadnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) is a withdrawn industrial project in Malkup, Parner, Ahmadnagar, Maharashtra. The site covers 39.2 acres.

Who is building it?

The applicant is M/S. Sopanrao Balkrishna Dhasal Agro Products Limited.

Has it been approved?

No. The application was withdrawn on 14 Feb 2024, so it is no longer under consideration.

Where is it?

In Malkup, Parner, Ahmadnagar, Maharashtra.

How big is it?

It has a stated cost of ₹401.7 crore and a site of 39.2 acres.

When was it filed?

The application was filed on 14 Feb 2024.

One of 9 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol)

Project details

Official titleProposed Expansion of 60 KLPD to 300 KLPD Distillery Plant (Ethanol) at Village Malkup, Tal Parner, Dist: Ahmednagar, Maharashtra by M/s. Sopanrao Balkrishna Dhasal Agro products Ltd (SBDAPL).
StatusWithdrawn
Status since14 Feb 2024
Application filed14 Feb 2024
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorIndustry
ApplicantM/S. Sopanrao Balkrishna Dhasal Agro Products Limited
Land area39.2 acres (15.9 ha)
Project cost₹401.7 crore
Village / localityMalkup
Taluk / tehsilParner
DistrictAhmadnagar
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-05611

All filings for this project

This project has 9 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 14 Feb 2024 (this page)Withdrawn39.2 acres₹401.7 crore
Ownership transfer filed 17 Oct 2023Lapsed39.2 acres₹401.7 crore
Ownership transfer filed 21 Sept 2023Lapsed39.2 acres₹401.7 crore
Ownership transfer filed 21 Sept 2023Environmental approval granted39.2 acres₹401.7 crore
Ownership transfer filed 18 Sept 2023Lapsed39.2 acres₹401.7 crore
Ownership transfer filed 18 Sept 2023Lapsed39.2 acres₹401.7 crore
Ownership transfer filed 16 Sept 2023Lapsed39.2 acres₹401.7 crore
Ownership transfer filed 16 Sept 2023Lapsed39.2 acres₹401.7 crore
Expansion filed 15 Mar 2023Environmental approval granted39.2 acres₹401.7 crore

In context

62 applications in Ahmadnagar since January 2022 are in the same category (Industry): 36 approved, 14 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 39.2 acres, this one is smaller than 66% of them.

Where it is

Malkup, Parner, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 9 Sopanrao Balkrishna Dhasal projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.