Quick answers
What is this project?
Proposed Silicone-Based Products Manufacturing Unit by M/s. Nishka Alliance LLP is a proposed industrial project in Bhagad, Mangaon, Raigarh, Maharashtra. The site covers 3 acres.
Who is building it?
The applicant is Nishka Alliance LLP.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Bhagad, Mangaon, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹22.9 crore and a site of 3 acres.
When was it filed?
The application was filed on 24 Mar 2023.
One of 4 filings for this project. The project's main page, with every filing and where each stands: Proposed Silicone-Based Products Manufacturing Unit by M/s. Nishka Alliance LLP
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 25 Jan 2024 |
| Application filed | 24 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Nishka Alliance LLP |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹22.9 crore |
| Village / locality | Bhagad |
| Taluk / tehsil | Mangaon |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-01813 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 28 Jan 2025 | More information requested | 3 acres | ₹22.9 crore |
| New project filed 26 Sept 2024 | Environmental approval granted | 3 acres | ₹22.9 crore |
| New project filed 8 Dec 2023 | Withdrawn | 3 acres | ₹22.9 crore |
| New project filed 24 Mar 2023 (this page) | Returned to applicant | 3 acres | ₹22.9 crore |
In context
260 applications in Raigarh since January 2022 are in the same category (Industry): 152 approved, 67 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3 acres, this one is smaller than 64% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhagad, Mangaon, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Silicone-Based Products Manufacturing Unit by M/s. Nishka Alliance LLP — more information requested, 0 m away
- Proposed Silicone-Based Products Manufacturing Unit by M/s. Nishka Alliance LLP — environmental approval granted, 0 m away
- Proposed Silicone-Based Products Manufacturing Unit by M/s. Nishka Alliance LLP — withdrawn, 0 m away
- Amalgamation of Existing Environmental Clearance of CGL, CRM and ACL… — environmental approval granted, 1.2 km away
- No Increase Pollution Load (NIPL) for Product Mix of Plant Capacity 25,50,000… — initial checks, 1.2 km away
- Industrial project by M/s. POSCO Maharashtra Steel Pvt. Ltd. (PMSPL). — initial checks, 1.2 km away
- Setting up Steel Plant with processes of Pickling, Cold Rolling, Galvanizing &… — more information requested, 2.2 km away
- Kumbhe Pumped Storage Project (1100 MW) — lapsed, 9.2 km away
All 4 Nishka Alliance projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.