What is Developing? Open the mapMap

WithdrawnOther · Raigarh, Maharashtra

Proposed Silicone-Based Products Manufacturing Unit by M/s. Nishka Alliance LLP

Proposed Silicone-Based Products Manufacturing Unit by M/s. Nishka Alliance LLP is a withdrawn project in Bhagad, Mangaon, Raigarh, Maharashtra. The site covers 3 acres. Its stated project cost is ₹22.9 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 8 Dec 2023).

See it on the live map All projects in Raigarh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Silicone-Based Products Manufacturing Unit by M/s. Nishka Alliance LLP is a withdrawn project in Bhagad, Mangaon, Raigarh, Maharashtra. The site covers 3 acres.

Who is building it?

The applicant is Nishka Alliance LLP.

Has it been approved?

No. The application was withdrawn on 8 Dec 2023, so it is no longer under consideration.

Where is it?

In Bhagad, Mangaon, Raigarh, Maharashtra.

How big is it?

It has a stated cost of ₹22.9 crore and a site of 3 acres.

When was it filed?

The application was filed on 8 Dec 2023.

One of 4 filings for this project. The project's main page, with every filing and where each stands: Proposed Silicone-Based Products Manufacturing Unit by M/s. Nishka Alliance LLP

Project details

StatusWithdrawn
Status since8 Dec 2023
Application filed8 Dec 2023
Approval soughtWildlife review
Application typeNew project
SectorOther
ApplicantNishka Alliance LLP
Land area3 acres (1.2 ha)
Project cost₹22.9 crore
Village / localityBhagad
Taluk / tehsilMangaon
DistrictRaigarh
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-16412

All filings for this project

This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 28 Jan 2025More information requested3 acres₹22.9 crore
New project filed 26 Sept 2024Environmental approval granted3 acres₹22.9 crore
New project filed 8 Dec 2023 (this page)Withdrawn3 acres₹22.9 crore
New project filed 24 Mar 2023Returned to applicant3 acres₹22.9 crore

In context

78 applications in Raigarh since January 2022 are in the same category (Other): 17 approved, 38 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3 acres, this one is smaller than 65% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhagad, Mangaon, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 4 Nishka Alliance projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.